Solar power plant · Laramie, WY
South Cheyenne Solar
South Cheyenne Solar is a 150 MW solar power plant in Laramie County, Wyoming, operated by Southern Power Co. Its oldest generator still running came online in 2024. In 2025 it generated 323 GWh, about what 32,000 average Wyoming homes use in a year.
South Cheyenne Solar in context
Among the 2 solar plants in Wyoming in the EIA's inventory, it is the largest, about 62% of the state's 242 MW of solar capacity.
Laramie County has 7 power plants of 1 MW or more with 746 MW in all; South Cheyenne Solar is 20% of that.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Laramie County goes 1.0 hours a year without power, the 17th most of 20 counties in Wyoming. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
South Cheyenne Solar (outlined) and other plants in Laramie County, shaded. 41.027, -104.776.
Plant facts
- Operator
- Southern Power Co
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- Laramie County, WY
- EIA plant ID
- 67147
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SCHY | Solar Photovoltaic | 150 MW | 2024 | – |
Questions
South Cheyenne Solar, answered
How much power does South Cheyenne Solar produce?
South Cheyenne Solar has 150 MW of capacity from one generator. In 2025 it generated 323 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does South Cheyenne Solar power?
Its 2025 output of 323 GWh equals the yearly electricity use of about 32,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is South Cheyenne Solar?
South Cheyenne Solar is in Laramie County, Wyoming, at about 41.027°, -104.776°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Laramie County goes 1.0 hours a year without power, the 17th most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates South Cheyenne Solar?
It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did South Cheyenne Solar open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.