Data centers · Wyoming

Data centers in Wyoming

30 operating data center sites, 5 projects planned or under construction and 1 AI campus planned to draw 249 MW.

Operating sites300 whole campuses
AI campuses1152 MW drawn now
In the pipeline51 under construction, 4 planned
Home price13.4¢/kWh+18% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned

AI campuses

Wyoming's AI data centers

CampusOwnerWhereNowPlanned
Meta CheyenneMetaLaramie County152 MW249 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Related Digital Data Center (CoreWeave Campus) Related Digital Laramie Under construction 302 MW 2026
Crusoe WY Campus Tallgrass (Project Jade; Crusoe exited Jun 2026) Laramie Planned 2.7 GW 2027
Prometheus Hyperscale - WY-1 (Evanston Campus) Prometheus Hyperscale Uinta Planned 1.3 GW 2027
Site Layer 4 Data Center Campus Site Layer 4 Platte Planned – –
Wind River Reservation Data Center Feasibility Study Northern Arapaho Tribe Fremont Planned – –

Local pushback

Bans and moratoriums

0 recorded as enacted, 0 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Cheyenne · Laramie Local Rejected May 27, 2026 Term not documented

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Laramie County281.0 h
Campbell County13.3 h
Fremont County11.0 h

Every named site

The list

10 of 30 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
NCAR-Wyoming Supercomputing Center University Corporation for Atmospheric Research Laramie Building 2.3
CYS42 Datacenter Microsoft Laramie Building 1.4
CYS41 Datacenter Microsoft Laramie Building 1.1
Cogent Cheyenne Data Center Cogent Communications Laramie Operator's own list –
Microsoft Cheyenne Data Center Cys13 & Cys14 (Microsoft Corp) Microsoft Laramie EPA record –
1547 Green House Data Center – Laramie EPA record –
Cys13 Data Center – Fremont EPA record –
Cys43 Data Center – Laramie EPA record –
Data Center-North Range Busin – Laramie EPA record –
Microsoft Cheyenne Data Center Cys17 - Cys22 Microsoft Laramie EPA record –

How many data centers are in Wyoming?

30 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 25th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Wyoming?

1 under construction and 4 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 4.3 GW, besides 1 AI campus tracked by Epoch AI.

Which Wyoming county has the most data centers?

Laramie County, with 28 operating sites, then Campbell County (1) and Fremont County (1).

Who operates data centers in Wyoming?

Among sites that name an operator: Microsoft (4), University Corporation for Atmospheric Research (1), Cogent Communications (1).

What AI data centers are in Wyoming?

Meta Cheyenne in Cheyenne (152 MW now, 249 MW planned), by Epoch AI's estimates.

What do Wyoming households pay for electricity?

13.4¢ per kWh on average in 2025 (US: 17.2¢), up 18% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.