Data centers · Wyoming
Data centers in Wyoming
30 operating data center sites, 5 projects planned or under construction and 1 AI campus planned to draw 249 MW.
The map
Every mapped site
AI campuses
Wyoming's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| Meta Cheyenne | Meta | Laramie County | 152 MW | 249 MW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| Related Digital Data Center (CoreWeave Campus) | Related Digital | Laramie | Under construction | 302 MW | 2026 |
| Crusoe WY Campus | Tallgrass (Project Jade; Crusoe exited Jun 2026) | Laramie | Planned | 2.7 GW | 2027 |
| Prometheus Hyperscale - WY-1 (Evanston Campus) | Prometheus Hyperscale | Uinta | Planned | 1.3 GW | 2027 |
| Site Layer 4 Data Center Campus | Site Layer 4 | Platte | Planned | – | – |
| Wind River Reservation Data Center Feasibility Study | Northern Arapaho Tribe | Fremont | Planned | – | – |
Local pushback
Bans and moratoriums
0 recorded as enacted, 0 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Laramie County | 28 | 1.0 h |
| Campbell County | 1 | 3.3 h |
| Fremont County | 1 | 1.0 h |
Every named site
The list
10 of 30 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| NCAR-Wyoming Supercomputing Center | University Corporation for Atmospheric Research | Laramie | Building | 2.3 |
| CYS42 Datacenter | Microsoft | Laramie | Building | 1.4 |
| CYS41 Datacenter | Microsoft | Laramie | Building | 1.1 |
| Cogent Cheyenne Data Center | Cogent Communications | Laramie | Operator's own list | – |
| Microsoft Cheyenne Data Center Cys13 & Cys14 (Microsoft Corp) | Microsoft | Laramie | EPA record | – |
| 1547 Green House Data Center | – | Laramie | EPA record | – |
| Cys13 Data Center | – | Fremont | EPA record | – |
| Cys43 Data Center | – | Laramie | EPA record | – |
| Data Center-North Range Busin | – | Laramie | EPA record | – |
| Microsoft Cheyenne Data Center Cys17 - Cys22 | Microsoft | Laramie | EPA record | – |
How many data centers are in Wyoming?
30 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 25th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Wyoming?
1 under construction and 4 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 4.3 GW, besides 1 AI campus tracked by Epoch AI.
Which Wyoming county has the most data centers?
Laramie County, with 28 operating sites, then Campbell County (1) and Fremont County (1).
Who operates data centers in Wyoming?
Among sites that name an operator: Microsoft (4), University Corporation for Atmospheric Research (1), Cogent Communications (1).
What AI data centers are in Wyoming?
Meta Cheyenne in Cheyenne (152 MW now, 249 MW planned), by Epoch AI's estimates.
What do Wyoming households pay for electricity?
13.4¢ per kWh on average in 2025 (US: 17.2¢), up 18% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.