Meta's AI campus in Utah County. It draws about 133 MW today and is planned to reach 179 MW by December 2025.

Power now133 MWAs of May 2, 2026
Planned peak179 MWDecember 2025
Compute151kH100-equivalent chips now
Capital cost$5.0BSo far, 2025 dollars

Latest look · May 2, 2026

What the satellite shows

Satellite image shows strong evidence that Buildings 1 and 2 are operational: colored motion artifacts on many cooling fans, plus cars parked at the building entrances.

Build-out

Power, month by month

0 MW50 MW100 MW150 MW200 MW202420252026
Power drawn by Meta Eagle Mountain, from Epoch AI's dated observations.
0 MW50 MW100 MW150 MW200 MW202420252026
Power drawn by Meta Eagle Mountain, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Meta
Used by
Meta
Built by
Mortenson
Energy companies
Williams
Chips
B300
Address
1275 N Community Cir, Eagle Mountain, UT 84005
County
Utah County (approximate)

Where

On the map of Utah

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed at the centre of Eagle Mountain, as no address could be matched, so the dot and the county are approximate.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Lake Side Power Plant● Natural gas1.25 GW13.6 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
May 2, 2026Satellite image shows strong evidence that Buildings 1 and 2 are operational: colored motion artifacts on many cooling fans, plus cars parked at the building entrances.179 MW
Dec 7, 2025Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.179 MW
Sep 8, 2025We believe Buildings 1 and 2 are still undergoing testing due to construction equipment and unfinished land surrounding the data center sites, as well as color motion artifacts on a small number of the cooling fans.–
Aug 1, 2023Land clearing begins.–

How much power does Meta Eagle Mountain use?

About 133 MW as of May 2, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 179 MW in its build plans by December 2025. Running all year, 133 MW would use about 1.2 TWh.

Who owns Meta Eagle Mountain?

Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta Eagle Mountain?

In Utah County, the average customer is without power about 1.5 hours in a typical year in this site's outage record, with 0 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta Eagle Mountain?

One plant is within 15 miles: Lake Side Power Plant (1.25 GW, natural gas), 13.6 miles away. Nearness does not mean it supplies the campus.