Data centers · Utah
Data centers in Utah
41 operating data center sites, 18 projects planned or under construction and 2 AI campuses planned to draw 590 MW.
The map
Every mapped site
AI campuses
Utah's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| Meta Eagle Mountain | Meta | Utah County | 133 MW | 179 MW |
| QTS Eagle Mountain | Meta | Utah County | – | 411 MW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| High Performance Compute Data Center Campus | Joule Capital Partners | Millard | Under construction | 4.0 GW | 2026 |
| Aligned Salt Lake SLC 03 | Aligned | Salt Lake | Under construction | 80 MW | 2026 |
| West Jordan Campus - Phase 2 | Novva | Salt Lake | Under construction | 75 MW | 2026 |
| West Jordan Campus - Phase 3 | Novva | Salt Lake | Under construction | 72 MW | 2026 |
| Delta Gigasite | Creekstone Energy (formerly Fibernet MercuryDelta) | Millard | Planned | 2.0 GW | – |
| Antelope Data Center | Pronghorn Development LLC | Iron | Planned | 1.5 GW | 2033 |
| Red Butte Energy and Data Center Campus | BrightNight | Iron | On hold | 1.5 GW | – |
| Energence Utah Digital Infrastructure Campus | Senmiao Technology / Energence Utah LLC | Duchesne | Planned | 1.2 GW | – |
| CyrusOne Dugway Proving Ground | CyrusOne | Tooele | Planned | 1.0 GW | 2029 |
| Tract - Project Tripletail | Tract | Utah | Planned | 400 MW | 2028 |
| Data Center Power Company - Summit Ridge Data Center | Data Center Power Company | Utah | Planned | 100 MW | 2027 |
| BluSky AI Milford Campus | BluSky AI | Beaver | Planned | 9 MW | – |
| BluSky AI Nephi | BluSky AI Inc. | Juab | Planned | 4 MW | 2027 |
| Antelope Data Campus (Project Antelope) | – | Iron | Planned | – | – |
| Cirrus Data Services - View 78 Campus | Cirrus Data Services | Salt Lake | Planned | – | 2026 |
| Nebo North Data Center Campus (Mona) | Nebo North LLC | Juab | Planned | – | – |
| Nine Mile Data Center | Nine Mile Data LLC | Duchesne | Planned | – | 2029 |
| Stratos Project (Hansel Valley Campus) | O'Leary Ventures (Kevin O'Leary); Military Installation Development Authority (MIDA), Utah | Box Elder | Planned | – | – |
| Volition Industries - Spanish Fork Data Center | Volition Industries | Utah | Planned | – | – |
| B+F Timpanogos Tech Center | B+F Timpanogos Tech Center LLC | Utah | Cancelled | 50 MW | – |
Local pushback
Bans and moratoriums
8 recorded as enacted, 0 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Clearfield · Davis | City | Enacted | Sep 8, 2026 | to Mar 7, 2027 |
| Wayne County · Wayne | Local | Enacted | Jul 21, 2026 | to Jan 17, 2027 |
| Grand County · Grand | Local | Enacted | Jul 7, 2026 | to Jan 3, 2027 |
| Logan · Cache | Local | Enacted | Jun 30, 2026 | to Dec 27, 2026 |
| Cache County · Cache | Local | Enacted | Jun 23, 2026 | to Dec 20, 2026 |
| Milford · Beaver | City | Enacted | Jun 16, 2026 | to Dec 13, 2026 |
| Box Elder County · Box Elder | Local | Enacted | Jun 10, 2026 | to Dec 7, 2026 |
| Iron County · Iron | Local | Enacted | May 26, 2026 | to Nov 22, 2026 |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Salt Lake County | 23 | 3.6 h |
| Utah County | 11 | 1.5 h |
| Washington County | 2 | 1.3 h |
| Millard County | 2 | 4.1 h |
| Uintah County | 1 | 3.3 h |
| Weber County | 1 | 6.5 h |
| Juab County | 1 | 1.9 h |
Every named site
The list
41 of 41 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| Meta | Meta | Utah | Building | 14 |
| Meta | Meta | Utah | Building | 14 |
| Meta | Meta | Utah | Building | 8.6 |
| Meta | Meta | Utah | Building | 7.9 |
| Meta | Meta | Utah | Building | 7.1 |
| West Jordan Campus - Phase 1 | Novva | Salt Lake | Civic Returns | 6.9 |
| Aligned Salt Lake SLC 01 | Aligned | Salt Lake | Civic Returns | 6.9 |
| Aligned Salt Lake SLC 02 | Aligned | Salt Lake | Civic Returns | 5.5 |
| eBay | – | Salt Lake | Building | 4.2 |
| Ebay | – | Salt Lake | Building | 3.3 |
| DataBank SLC6 | DataBank | Salt Lake | Building | 2.1 |
| DataBank SLC5 | DataBank | Salt Lake | Building | 2.1 |
| DataBank SLC3 | DataBank | Salt Lake | Building | 1.9 |
| DataBank SLC2 | DataBank | Salt Lake | Building | 1.6 |
| Flexential Salt Lake City - Downtown | Flexential | Salt Lake | Building | 1.4 |
| Flexential Salt Lake City - South Valley | Flexential | Salt Lake | Building | 0.7 |
| DataBank SLC4 | DataBank | Salt Lake | Building | 0.7 |
| Flexential Salt Lake City - Millcreek | Flexential | Salt Lake | Building | 0.6 |
| EdgeConneX SLC01 | EdgeConneX | Salt Lake | Civic Returns | 0.6 |
| Verizon | – | Salt Lake | Building | 0.4 |
| Strata Networks | – | Uintah | Building | 0.3 |
| Flexential Salt Lake City - Fair Park | Flexential | Salt Lake | Building | 0.3 |
| Downtown Salt Lake City Data Center: SLC1 | DataBank | Salt Lake | Civic Returns | 0.2 |
| FiberState Datacenter | – | Salt Lake | Building | 0.2 |
| Lumen | Lumen | Washington | Building | 0.0 |
| Flexential Salt Lake City - Lindon | Flexential | Utah | Point | – |
| ValorC3 | – | Washington | Point | – |
| Aligned Salt Lake SLC 04 | Aligned | Salt Lake | Civic Returns | – |
| Aligned Data Centers SLC-04 | Aligned Data Centers | Salt Lake | Operator's own list | – |
| Cogent Salt Lake City Edge Data Center | Cogent Communications | Salt Lake | Operator's own list | – |
| Lumen Ogden, UT | Lumen | Weber | Operator's own list | – |
| Meta Eagle Mountain Data Center | Meta | Utah | Operator's own list | – |
| Novva Slc Common | Novva | Salt Lake | EPA record | – |
| Ace Data Center | – | Utah | EPA record | – |
| Eagle Mountain Data Center Infrastructure | – | Utah | EPA record | – |
| Granite Fortress Llc - Juab Data Center | – | Juab | EPA record | – |
| Joule Capital Partners, Llc - Site #1 Data Center | – | Millard | EPA record | – |
| Joule Capital Partners, Llc - Site #4 Data Center | – | Millard | EPA record | – |
| National Security Agency Utah Data Center | – | Utah | EPA record | – |
| Utah Data Center | – | Utah | EPA record | – |
| Flexential - Cottonwood Data Center | Flexential | Salt Lake | Overture place | – |
How many data centers are in Utah?
41 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 20th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Utah?
4 under construction and 14 planned or announced in the Civic Returns and Server Country databases; the 12 that publish a size add up to about 10.4 GW, besides 2 AI campuses tracked by Epoch AI. 1 project has been cancelled.
Which Utah county has the most data centers?
Salt Lake County, with 23 operating sites, then Utah County (11) and Washington County (2).
Who operates data centers in Utah?
Among sites that name an operator: Meta (6), DataBank (6), Flexential (6), Aligned (3), Novva (2).
What AI data centers are in Utah?
Meta Eagle Mountain in Eagle Mountain (133 MW now, 179 MW planned); QTS Eagle Mountain in Eagle Mountain (not yet drawing power, 411 MW planned), by Epoch AI's estimates.
What do Utah households pay for electricity?
13.0¢ per kWh on average in 2025 (US: 17.2¢), up 25% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.