Data centers · Utah

Data centers in Utah

41 operating data center sites, 18 projects planned or under construction and 2 AI campuses planned to draw 590 MW.

Operating sites410 whole campuses
AI campuses2133 MW drawn now
In the pipeline184 under construction, 14 planned
Home price13.0¢/kWh+25% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Utah's AI data centers

CampusOwnerWhereNowPlanned
Meta Eagle MountainMetaUtah County133 MW179 MW
QTS Eagle MountainMetaUtah County–411 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
High Performance Compute Data Center Campus Joule Capital Partners Millard Under construction 4.0 GW 2026
Aligned Salt Lake SLC 03 Aligned Salt Lake Under construction 80 MW 2026
West Jordan Campus - Phase 2 Novva Salt Lake Under construction 75 MW 2026
West Jordan Campus - Phase 3 Novva Salt Lake Under construction 72 MW 2026
Delta Gigasite Creekstone Energy (formerly Fibernet MercuryDelta) Millard Planned 2.0 GW –
Antelope Data Center Pronghorn Development LLC Iron Planned 1.5 GW 2033
Red Butte Energy and Data Center Campus BrightNight Iron On hold 1.5 GW –
Energence Utah Digital Infrastructure Campus Senmiao Technology / Energence Utah LLC Duchesne Planned 1.2 GW –
CyrusOne Dugway Proving Ground CyrusOne Tooele Planned 1.0 GW 2029
Tract - Project Tripletail Tract Utah Planned 400 MW 2028
Data Center Power Company - Summit Ridge Data Center Data Center Power Company Utah Planned 100 MW 2027
BluSky AI Milford Campus BluSky AI Beaver Planned 9 MW –
BluSky AI Nephi BluSky AI Inc. Juab Planned 4 MW 2027
Antelope Data Campus (Project Antelope) – Iron Planned – –
Cirrus Data Services - View 78 Campus Cirrus Data Services Salt Lake Planned – 2026
Nebo North Data Center Campus (Mona) Nebo North LLC Juab Planned – –
Nine Mile Data Center Nine Mile Data LLC Duchesne Planned – 2029
Stratos Project (Hansel Valley Campus) O'Leary Ventures (Kevin O'Leary); Military Installation Development Authority (MIDA), Utah Box Elder Planned – –
Volition Industries - Spanish Fork Data Center Volition Industries Utah Planned – –
B+F Timpanogos Tech Center B+F Timpanogos Tech Center LLC Utah Cancelled 50 MW –

Local pushback

Bans and moratoriums

8 recorded as enacted, 0 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Clearfield · Davis City Enacted Sep 8, 2026 to Mar 7, 2027
Wayne County · Wayne Local Enacted Jul 21, 2026 to Jan 17, 2027
Grand County · Grand Local Enacted Jul 7, 2026 to Jan 3, 2027
Logan · Cache Local Enacted Jun 30, 2026 to Dec 27, 2026
Cache County · Cache Local Enacted Jun 23, 2026 to Dec 20, 2026
Milford · Beaver City Enacted Jun 16, 2026 to Dec 13, 2026
Box Elder County · Box Elder Local Enacted Jun 10, 2026 to Dec 7, 2026
Iron County · Iron Local Enacted May 26, 2026 to Nov 22, 2026

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Salt Lake County233.6 h
Utah County111.5 h
Washington County21.3 h
Millard County24.1 h
Uintah County13.3 h
Weber County16.5 h
Juab County11.9 h

Every named site

The list

41 of 41 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Meta Meta Utah Building 14
Meta Meta Utah Building 14
Meta Meta Utah Building 8.6
Meta Meta Utah Building 7.9
Meta Meta Utah Building 7.1
West Jordan Campus - Phase 1 Novva Salt Lake Civic Returns 6.9
Aligned Salt Lake SLC 01 Aligned Salt Lake Civic Returns 6.9
Aligned Salt Lake SLC 02 Aligned Salt Lake Civic Returns 5.5
eBay – Salt Lake Building 4.2
Ebay – Salt Lake Building 3.3
DataBank SLC6 DataBank Salt Lake Building 2.1
DataBank SLC5 DataBank Salt Lake Building 2.1
DataBank SLC3 DataBank Salt Lake Building 1.9
DataBank SLC2 DataBank Salt Lake Building 1.6
Flexential Salt Lake City - Downtown Flexential Salt Lake Building 1.4
Flexential Salt Lake City - South Valley Flexential Salt Lake Building 0.7
DataBank SLC4 DataBank Salt Lake Building 0.7
Flexential Salt Lake City - Millcreek Flexential Salt Lake Building 0.6
EdgeConneX SLC01 EdgeConneX Salt Lake Civic Returns 0.6
Verizon – Salt Lake Building 0.4
Strata Networks – Uintah Building 0.3
Flexential Salt Lake City - Fair Park Flexential Salt Lake Building 0.3
Downtown Salt Lake City Data Center: SLC1 DataBank Salt Lake Civic Returns 0.2
FiberState Datacenter – Salt Lake Building 0.2
Lumen Lumen Washington Building 0.0

How many data centers are in Utah?

41 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 20th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Utah?

4 under construction and 14 planned or announced in the Civic Returns and Server Country databases; the 12 that publish a size add up to about 10.4 GW, besides 2 AI campuses tracked by Epoch AI. 1 project has been cancelled.

Which Utah county has the most data centers?

Salt Lake County, with 23 operating sites, then Utah County (11) and Washington County (2).

Who operates data centers in Utah?

Among sites that name an operator: Meta (6), DataBank (6), Flexential (6), Aligned (3), Novva (2).

What AI data centers are in Utah?

Meta Eagle Mountain in Eagle Mountain (133 MW now, 179 MW planned); QTS Eagle Mountain in Eagle Mountain (not yet drawing power, 411 MW planned), by Epoch AI's estimates.

What do Utah households pay for electricity?

13.0¢ per kWh on average in 2025 (US: 17.2¢), up 25% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.