Where the power comes from · 2025
Utah
Coal made 47% of the electricity generated in Utah in 2025, the 6th highest coal share of any state. In 2005, coal made 94% of it; in 2025, 47%.
The mix
Utah's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Utah's power plants
135 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Utah, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Utah's power plants emitted 601 kg of CO₂ for each MWh they generated in 2024, against 952 kg in 2005: the 44th lowest of 51. 21 million metric tons in all.
Utah among the states
- Generation38.1 TWh38th
- Renewable share22%23rd
- Carbon-free share22%40th
- Cleanest electricity (kg CO₂/MWh, 2024)60144th
- Coal share47%6th
- Natural gas share30%32nd
- Solar share17%4th
- Wind share2.1%29th
Plants
The largest plants in Utah
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Hunter | Coal | Emery | 1.5 GW | 6.8 TWh | 53% | 1978 |
| Lake Side Power Plant | Natural gas | Utah | 1.2 GW | 6.0 TWh | 55% | 2007 |
| Intermountain Power Project | Natural gas | Millard | 1.1 GW | 4.8 TWh | – | 2025 |
| Huntington | Coal | Emery | 1.0 GW | 4.3 TWh | 48% | 1974 |
| Green River Energy Center - Hybrid | Storage | Emery | 800 MW | – | – | 2026 |
| Currant Creek | Natural gas | Juab | 567 MW | 2.8 TWh | 56% | 2005 |
| Faraday Solar | Solar | Utah | 525 MW | 611 GWh | – | 2025 |
| Bonanza | Coal | Uintah | 512 MW | 2.5 TWh | 57% | 1986 |
| Gadsby | Natural gas | Salt Lake | 433 MW | 230 GWh | 6% | 1951 |
| West Valley Generation Project | Natural gas | Salt Lake | 217 MW | 397 GWh | 21% | 2001 |
| Milford Wind Corridor I LLC | Wind | Beaver | 204 MW | 401 GWh | 23% | 2009 |
| Appaloosa Solar I | Solar | Iron | 200 MW | 540 GWh | 31% | 2024 |
| Hornshadow Solar II, LLC | Solar | Emery | 200 MW | 228 GWh | – | 2025 |
| Dominguez Energy Storage | Storage | Salt Lake | 200 MW | -0.2 GWh | – | 2025 |
| Flaming Gorge | Hydro | Daggett | 152 MW | 323 GWh | 24% | 1963 |
| Faraday Energy Storage | Storage | Utah | 150 MW | – | – | 2026 |
| Nebo Power Station | Natural gas | Utah | 140 MW | 769 GWh | 63% | 2004 |
| Cove Mountain Solar 2 | Solar | Iron | 122 MW | 321 GWh | 30% | 2020 |
| Milford Wind Corridor Stage II LLC | Wind | Beaver | 102 MW | 199 GWh | 22% | 2011 |
| Hunter Solar LLC (UT) | Solar | Emery | 100 MW | 260 GWh | 30% | 2021 |
| Hornshadow Solar, LLC | Solar | Emery | 100 MW | 149 GWh | – | 2025 |
| Milford Solar 1 | Solar | Beaver | 99 MW | 261 GWh | 30% | 2020 |
| Millcreek Power Generation | Natural gas | Washington | 80 MW | 145 GWh | 21% | 2006 |
| Utah Red Hills Renewable Energy Park | Solar | Iron | 80 MW | 208 GWh | 30% | 2015 |
| Enterprise Solar, LLC | Solar | Iron | 80 MW | 219 GWh | 31% | 2016 |
| Escalante Solar I, LLC | Solar | Beaver | 80 MW | 212 GWh | 30% | 2016 |
| Escalante Solar II, LLC | Solar | Beaver | 80 MW | 212 GWh | 30% | 2016 |
| Escalante Solar III, LLC | Solar | Beaver | 80 MW | 209 GWh | 30% | 2016 |
| Iron Springs Solar, LLC | Solar | Iron | 80 MW | 214 GWh | 31% | 2016 |
| Granite Mountain Solar East, LLC | Solar | Iron | 80 MW | 203 GWh | 29% | 2016 |
| Three Peaks Power | Solar | Iron | 80 MW | 226 GWh | 32% | 2016 |
| Sigurd Solar LLC | Solar | Sevier | 80 MW | 200 GWh | 28% | 2021 |
| Clover Creek Solar Community Solar | Solar | Juab | 80 MW | 197 GWh | 28% | 2021 |
| Rocket Solar, LLC | Solar | Box Elder | 80 MW | 211 GWh | 30% | 2024 |
| Graphite Solar I | Solar | Carbon | 80 MW | 188 GWh | 27% | 2022 |
| Elektron Solar, LLC | Solar | Tooele | 80 MW | 212 GWh | 30% | 2024 |
| Steel Solar LLC | Solar | Box Elder | 80 MW | 198 GWh | 28% | 2024 |
| Iron Springs BESS | Storage | Iron | 80 MW | – | – | 2026 |
| Escalante BESS I | Storage | Beaver | 80 MW | – | – | 2026 |
| Enterprise Storage | Storage | Iron | 80 MW | – | – | 2026 |
| Granite Mountain BESS East | Storage | Iron | 80 MW | – | – | 2026 |
| Horseshoe Solar, LLC | Solar | Tooele | 75 MW | 196 GWh | 30% | 2024 |
| Red Mesa Solar Project | Solar | San Juan | 72 MW | 188 GWh | 30% | 2023 |
| Latigo Wind Park | Wind | San Juan | 62 MW | 152 GWh | 28% | 2016 |
| Sunnyside Cogen Associates | Coal | Carbon | 58 MW | 226 GWh | 44% | 1993 |
| Cove Mountain Solar | Solar | Iron | 58 MW | 159 GWh | 31% | 2020 |
| Sage Solar I-III | Solar | Rich | 58 MW | 137 GWh | 27% | 2019 |
| Granite Mountain Solar West, LLC | Solar | Iron | 50 MW | 125 GWh | 28% | 2016 |
| Pavant Solar, LLC | Solar | Millard | 50 MW | 114 GWh | 26% | 2015 |
| Pavant Solar II LLC | Solar | Millard | 50 MW | 86 GWh | 20% | 2016 |
| Cape Generating Station | Geothermal | Beaver | 43 MW | – | – | 2026 |
| Murray Turbine | Natural gas | Salt Lake | 42 MW | 0.2 GWh | 0% | 2001 |
| Castle Solar, LLC | Solar | Emery | 40 MW | 108 GWh | 31% | 2024 |
| Kennecott Power Plant | Other | Salt Lake | 38 MW | 152 GWh | 46% | 1995 |
| Blundell | Geothermal | Beaver | 38 MW | 271 GWh | 81% | 1984 |
| Bountiful City | Natural gas | Davis | 30 MW | 31 GWh | 12% | 2001 |
| Tesoro SLC Cogeneration Plant | Natural gas | Salt Lake | 30 MW | 199 GWh | 75% | 2004 |
| Cutler Hydro | Hydro | Box Elder | 30 MW | 41 GWh | 16% | 1927 |
| Copperton Solar Plant No. 1 | Solar | Salt Lake | 30 MW | 7.3 GWh | – | 2024 |
| Whitehead | Natural gas | Utah | 27 MW | 11 GWh | 5% | 1986 |
| Cove Fort | Geothermal | Beaver | 25 MW | 142 GWh | 65% | 2013 |
| Pavant Solar III | Solar | Millard | 20 MW | 44 GWh | 25% | 2016 |
| Payson | Natural gas | Utah | 20 MW | 0.0 GWh | – | 1988 |
| Spanish Fork Wind Park 2 LLC | Wind | Utah | 19 MW | 42 GWh | 26% | 2008 |
| Heber City | Natural gas | Wasatch | 18 MW | 17 GWh | 11% | 2002 |
| BYU Central Heating Plant | Natural gas | Utah | 17 MW | 116 GWh | 80% | 2019 |
| Logan City | Natural gas | Cache | 16 MW | 2.0 GWh | 1% | 2002 |
| Hurricane City Power | Natural gas | Washington | 15 MW | 7.0 GWh | 5% | 1999 |
| Solomon Generating Facility | Natural gas | Washington | 15 MW | 21 GWh | 16% | 2022 |
| St George Red Rock | Oil | Washington | 14 MW | 0.0 GWh | – | 1987 |
| Thermo No 1 | Geothermal | Beaver | 14 MW | 56 GWh | 46% | 2013 |
| Jordanelle Dam Hydroelectric Project | Hydro | Wasatch | 13 MW | 49 GWh | 43% | 2008 |
| Provo Power Plant | Natural gas | Utah | 12 MW | 4.4 GWh | 4% | 2018 |
| Bloomington Power Plant | Oil | Washington | 10 MW | 0.0 GWh | – | 1999 |
| Logan City 2 | Natural gas | Cache | 10 MW | – | – | 2026 |
| Veyo Heat Recovery Project | Other | Washington | 9.5 MW | 9.6 GWh | 12% | 2016 |
| HTW Plant 303 COGEN | Natural gas | Salt Lake | 7.4 MW | 47 GWh | 73% | 2008 |
| Tooele Army Depot(CSG) | Wind | Tooele | 7.2 MW | – | – | 2010 |
| Hydro II | Hydro | Cache | 6.6 MW | 16 GWh | 27% | 1986 |
| Snowbird Power Plant | Natural gas | Salt Lake | 6.5 MW | 15 GWh | 26% | 2022 |
| Washington City Electric Generation | Natural gas | Washington | 6.0 MW | 5.9 GWh | 11% | 2007 |
| Pioneer | Hydro | Weber | 5.0 MW | 11 GWh | 24% | 1910 |
| Central Energy Plant USU | Natural gas | Cache | 5.0 MW | 23 GWh | 53% | 2004 |
| Smithfield 1 | Solar | Beaver | 5.0 MW | 13 GWh | 29% | 2024 |
| Deer Creek (UT) | Hydro | Wasatch | 4.8 MW | 22 GWh | 53% | 1958 |
| Little Cottonwood | Hydro | Salt Lake | 4.8 MW | 8.5 GWh | 20% | 1983 |
| Trans-Jordan Generating Station | Biomass | Salt Lake | 4.8 MW | 35 GWh | 84% | 2009 |
| Echo Dam | Hydro | Summit | 4.4 MW | 8.6 GWh | 22% | 1987 |
| Boulder | Hydro | Garfield | 4.2 MW | 17 GWh | 47% | 1958 |
| Gateway | Hydro | Morgan | 4.0 MW | 8.0 GWh | 23% | 1958 |
| Spanish Fork Community Solar | Solar | Utah | 4.0 MW | 7.4 GWh | 21% | 2021 |
| Weber | Hydro | Weber | 3.8 MW | -0.2 GWh | – | 1911 |
| Swire Coca-Cola Draper | Solar | Salt Lake | 3.7 MW | – | – | 2026 |
| Spanish Fork | Hydro | Utah | 3.6 MW | – | – | 1937 |
| SF Auto O1 | Solar | Weber | 3.4 MW | 6.8 GWh | 23% | 2023 |
| Salt Lake Energy Systems | Biomass | Salt Lake | 3.2 MW | 13 GWh | 45% | 2006 |
| Blue Mountain Biogas | Biomass | Beaver | 3.2 MW | 0.0 GWh | – | 2012 |
| SF Auto T1 | Solar | Box Elder | 3.1 MW | 7.2 GWh | 27% | 2023 |
| Beryl Solar Plant | Solar | Iron | 3.0 MW | 6.5 GWh | 25% | 2015 |
| Cedar Valley Solar Plant | Solar | Iron | 3.0 MW | 6.2 GWh | 24% | 2015 |
Coming next
Planned projects
The largest generators reported as planned in Utah, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Notch Peak Solar LLC | Solar | Millard | 324 MW | 2028 |
| Milford Solar Phase II | Solar | Beaver | 310 MW | 2027 |
| Utah Solar 1 | Solar | Millard | 300 MW | 2027 |
| Red Butte Solar and Storage | Solar | Iron | 300 MW | 2029 |
| Red Butte Solar and Storage | Storage | Iron | 300 MW | 2029 |
| Gale 1 Solar | Solar | Millard | 300 MW | 2030 |
| Intermountain Pumped Storage Project | Storage | Millard | 250 MW | 2028 |
| Intermountain Pumped Storage Project | Storage | Millard | 250 MW | 2028 |
| Intermountain Pumped Storage Project | Storage | Millard | 250 MW | 2028 |
| Intermountain Pumped Storage Project | Storage | Millard | 250 MW | 2028 |
| Fremont Solar | Storage | Iron | 198 MW | 2027 |
| Gale 1 Solar | Storage | Millard | 150 MW | 2030 |
| Fremont Solar | Solar | Iron | 99 MW | 2027 |
| Glen Canyon Solar A, LLC | Solar | Kane | 95 MW | 2028 |
| Parowan Solar | Storage | Iron | 58 MW | 2028 |
| Parowan Solar | Solar | Iron | 58 MW | 2028 |
| Cape Generating Station | Geothermal | Beaver | 43 MW | 2027 |
| Cape Generating Station | Geothermal | Beaver | 43 MW | 2027 |
| Brigham City Gas | Natural gas | Box Elder | 2.5 MW | 2028 |
| Brigham City Gas | Natural gas | Box Elder | 2.5 MW | 2028 |
| Brigham City Gas | Natural gas | Box Elder | 2.5 MW | 2028 |
| Rodatherm Milford 1 | Geothermal | Beaver | 1.8 MW | 2028 |
Shut down
Retired since 2010
The largest generators retired in Utah since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Intermountain Power Project | Coal | 820 MW | 2025 |
| Intermountain Power Project | Coal | 820 MW | 2025 |
| Carbon | Coal | 114 MW | 2015 |
| Kennecott Power Plant | Coal | 82 MW | 2019 |
| Carbon | Coal | 75 MW | 2015 |
| Kennecott Power Plant | Coal | 50 MW | 2016 |
| Kennecott Power Plant | Coal | 25 MW | 2016 |
| Kennecott Power Plant | Coal | 25 MW | 2016 |
| US Magnesium | Natural gas | 16 MW | 2025 |
| US Magnesium | Natural gas | 16 MW | 2025 |
| US Magnesium | Natural gas | 16 MW | 2025 |
| Little Mountain | Natural gas | 16 MW | 2011 |
| Thermo No 1 | Geothermal | 14 MW | 2013 |
| Provo | Natural gas | 7.5 MW | 2016 |
| Bountiful City | Natural gas | 7.0 MW | 2014 |
| Whitehead | Natural gas | 7.0 MW | 2023 |
| eBay - South Jordan | Natural gas | 6.0 MW | 2020 |
| Olmstead | Hydro | 5.5 MW | 2015 |
| Whitehead | Natural gas | 5.0 MW | 2023 |
| eBay - South Jordan | Natural gas | 3.8 MW | 2020 |
| Bountiful City | Natural gas | 2.5 MW | 2011 |
| Payson | Natural gas | 2.5 MW | 2024 |
| Provo | Natural gas | 2.5 MW | 2016 |
| Provo | Natural gas | 2.5 MW | 2016 |
| Provo | Natural gas | 2.5 MW | 2016 |
| Provo | Natural gas | 2.5 MW | 2016 |
| Olmstead | Hydro | 2.4 MW | 2015 |
| Olmstead | Hydro | 2.4 MW | 2015 |
| Payson | Natural gas | 2.0 MW | 2024 |
| Bloomington Power Plant | Oil | 1.7 MW | 2010 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.