Wind power plant · Utah, UT
Spanish Fork Wind Park 2 LLC
Spanish Fork Wind Park 2 LLC is a 19 MW wind power plant in Utah County, Utah, operated by Spanish Fork Wind Park 2, LLC. Its oldest generator still running came online in 2008. In 2025 it generated 42 GWh, about what 4,600 average Utah homes use in a year.
Spanish Fork Wind Park 2 LLC in context
Among the 5 wind plants in Utah in the EIA's inventory, it is the 4th largest, about 4.8% of the state's 394 MW of wind capacity.
Utah County has 12 power plants of 1 MW or more with 2.2 GW in all; Spanish Fork Wind Park 2 LLC is 1% of that.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Utah County goes 1.5 hours a year without power, the 22nd most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Spanish Fork Wind Park 2 LLC (outlined) and other plants in Utah County, shaded. 40.071, -111.582.
Plant facts
- Operator
- Spanish Fork Wind Park 2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Utah County, UT
- EIA plant ID
- 56751
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 19 MW | 2008 | – |
Questions
Spanish Fork Wind Park 2 LLC, answered
How much power does Spanish Fork Wind Park 2 LLC produce?
Spanish Fork Wind Park 2 LLC has 19 MW of capacity from one generator. In 2025 it generated 42 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Spanish Fork Wind Park 2 LLC power?
Its 2025 output of 42 GWh equals the yearly electricity use of about 4,600 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Spanish Fork Wind Park 2 LLC?
Spanish Fork Wind Park 2 LLC is in Utah County, Utah, at about 40.071°, -111.582°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Utah County goes 1.5 hours a year without power, the 22nd most of 23 counties in Utah. The county's page has the full outage record.
Who operates Spanish Fork Wind Park 2 LLC?
It is operated by Spanish Fork Wind Park 2, LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Spanish Fork Wind Park 2 LLC open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.