Solar power plant · Utah, UT

Faraday Solar

Faraday Solar is a 525 MW solar power plant in Utah County, Utah, operated by Faraday Solar B LLC. Its oldest generator still running came online in 2025. In 2025 it generated 611 GWh, about what 67,000 average Utah homes use in a year.

Capacity525 MWNameplate, September 2026
Generated611 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Faraday Solar in context

Among the 56 solar plants in Utah in the EIA's inventory, it is the largest, about 17% of the state's 3.0 GW of solar capacity.

Utah County has 12 power plants of 1 MW or more with 2.2 GW in all; Faraday Solar is 24% of that and the largest of 2 solar plants there.

The average electricity customer in Utah County goes 1.5 hours a year without power, the 22nd most of 23 counties in Utah. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Faraday Solar (outlined) and other plants in Utah County, shaded. 40.094, -112.083.

Plant facts

Operator
Faraday Solar B LLC
Sector
IPP Non-CHP
Grid operator
PACE
County
Utah County, UT
EIA plant ID
69748
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FARPV Solar Photovoltaic 525 MW 2025 –

Questions

Faraday Solar, answered

How much power does Faraday Solar produce?

Faraday Solar has 525 MW of capacity from one generator. In 2025 it generated 611 GWh.

How many homes does Faraday Solar power?

Its 2025 output of 611 GWh equals the yearly electricity use of about 67,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Faraday Solar?

Faraday Solar is in Utah County, Utah, at about 40.094°, -112.083°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Utah County goes 1.5 hours a year without power, the 22nd most of 23 counties in Utah. The county's page has the full outage record.

Who operates Faraday Solar?

It is operated by Faraday Solar B LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Faraday Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.