Storage power plant · Beaver, UT

Escalante BESS I

Escalante BESS I is a 80 MW storage power plant in Beaver County, Utah, operated by Escalante BESS I LLC. Its oldest generator still running came online in 2026.

Capacity80 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Escalante BESS I in context

Among the 7 storage plants in Utah in the EIA's inventory, it is the 5th largest, about 5.4% of the state's 1.5 GW of storage capacity.

Beaver County has 21 power plants of 1 MW or more with 874 MW in all; Escalante BESS I is 9% of that.

The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.

Where it is

Escalante BESS I (outlined) and other plants in Beaver County, shaded. 38.519, -113.028.

Plant facts

Operator
Escalante BESS I LLC
Sector
IPP Non-CHP
Grid operator
PACE
County
Beaver County, UT
EIA plant ID
69677
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ESCBA Batteries 80 MW · 80 MWh 2026 –

Questions

Escalante BESS I, answered

How much can Escalante BESS I store and deliver?

Escalante BESS I can deliver up to 80 MW and hold 80 MWh of energy, from one battery or storage system.

Where is Escalante BESS I?

Escalante BESS I is in Beaver County, Utah, at about 38.519°, -113.028°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.

Who operates Escalante BESS I?

It is operated by Escalante BESS I LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Escalante BESS I open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.