Wind power plant · Beaver, UT
Milford Wind Corridor Stage II LLC
Milford Wind Corridor Stage II LLC is a 102 MW wind power plant in Beaver County, Utah, operated by Milford Wind Corridor Stage II LLC. Its oldest generator still running came online in 2011. In 2025 it generated 199 GWh, about what 22,000 average Utah homes use in a year.
Milford Wind Corridor Stage II LLC in context
Among the 5 wind plants in Utah in the EIA's inventory, it is the 2nd largest, about 26% of the state's 394 MW of wind capacity.
Beaver County has 21 power plants of 1 MW or more with 874 MW in all; Milford Wind Corridor Stage II LLC is 12% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 22% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Milford Wind Corridor Stage II LLC (outlined) and other plants in Beaver County, shaded. 38.585, -112.931.
Plant facts
- Operator
- Milford Wind Corridor Stage II LLC
- Sector
- IPP Non-CHP
- Grid operator
- LDWP
- County
- Beaver County, UT
- EIA plant ID
- 57107
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 102 MW | 2011 | – |
Questions
Milford Wind Corridor Stage II LLC, answered
How much power does Milford Wind Corridor Stage II LLC produce?
Milford Wind Corridor Stage II LLC has 102 MW of capacity from one generator. In 2025 it generated 199 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Milford Wind Corridor Stage II LLC power?
Its 2025 output of 199 GWh equals the yearly electricity use of about 22,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Milford Wind Corridor Stage II LLC?
Milford Wind Corridor Stage II LLC is in Beaver County, Utah, at about 38.585°, -112.931°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.
Who operates Milford Wind Corridor Stage II LLC?
It is operated by Milford Wind Corridor Stage II LLC (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.
When did Milford Wind Corridor Stage II LLC open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.