Wind power plant · Beaver, UT

Milford Wind Corridor I LLC

Milford Wind Corridor I LLC is a 204 MW wind power plant in Beaver County, Utah, operated by Milford Wind Corridor Phase I, LLC (Longroad). Its oldest generator still running came online in 2009. In 2025 it generated 401 GWh, about what 44,000 average Utah homes use in a year.

Capacity204 MWNameplate, September 2026
Generated401 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2009

Milford Wind Corridor I LLC in context

Among the 5 wind plants in Utah in the EIA's inventory, it is the largest, about 52% of the state's 394 MW of wind capacity.

Beaver County has 21 power plants of 1 MW or more with 874 MW in all; Milford Wind Corridor I LLC is 23% of that and the largest of 2 wind plants there.

Its capacity factor of 23% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 401
01002003004005002019202120232025401

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Milford Wind Corridor I LLC (outlined) and other plants in Beaver County, shaded. 38.536, -112.935.

Plant facts

Operator
Milford Wind Corridor Phase I, LLC (Longroad)
Sector
IPP Non-CHP
Grid operator
LDWP
County
Beaver County, UT
EIA plant ID
57079
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 204 MW 2009 –

Questions

Milford Wind Corridor I LLC, answered

How much power does Milford Wind Corridor I LLC produce?

Milford Wind Corridor I LLC has 204 MW of capacity from one generator. In 2025 it generated 401 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Milford Wind Corridor I LLC power?

Its 2025 output of 401 GWh equals the yearly electricity use of about 44,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Milford Wind Corridor I LLC?

Milford Wind Corridor I LLC is in Beaver County, Utah, at about 38.536°, -112.935°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.

Who operates Milford Wind Corridor I LLC?

It is operated by Milford Wind Corridor Phase I, LLC (Longroad) (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.

When did Milford Wind Corridor I LLC open?

Its oldest generator still running came online in 2009.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.