Solar power plant · Beaver, UT

Escalante Solar III, LLC

Escalante Solar III, LLC is a 80 MW solar power plant in Beaver County, Utah, operated by Clearway Renewable Operation & Maintenance LLC. Its oldest generator still running came online in 2016. In 2025 it generated 209 GWh, about what 23,000 average Utah homes use in a year.

Capacity80 MWNameplate, September 2026
Generated209 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2016

Escalante Solar III, LLC in context

Among the 56 solar plants in Utah in the EIA's inventory, it is the 12th largest, about 2.6% of the state's 3.0 GW of solar capacity.

Beaver County has 21 power plants of 1 MW or more with 874 MW in all; Escalante Solar III, LLC is 9% of that and the 4th largest of 12 solar plants there.

Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020182019202020212022202320242025GWh 209
0501001502002502019202120232025209

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Escalante Solar III, LLC (outlined) and other plants in Beaver County, shaded. 38.498, -112.987.

Plant facts

Operator
Clearway Renewable Operation & Maintenance LLC
Sector
IPP Non-CHP
Grid operator
PACE
County
Beaver County, UT
EIA plant ID
59389
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ESCS3 Solar Photovoltaic 80 MW 2016 –

Questions

Escalante Solar III, LLC, answered

How much power does Escalante Solar III, LLC produce?

Escalante Solar III, LLC has 80 MW of capacity from one generator. In 2025 it generated 209 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Escalante Solar III, LLC power?

Its 2025 output of 209 GWh equals the yearly electricity use of about 23,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Escalante Solar III, LLC?

Escalante Solar III, LLC is in Beaver County, Utah, at about 38.498°, -112.987°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Beaver County goes 9.7 hours a year without power, the 2nd most of 23 counties in Utah. The county's page has the full outage record.

Who operates Escalante Solar III, LLC?

It is operated by Clearway Renewable Operation & Maintenance LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Escalante Solar III, LLC open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.