Solar power plant · Millard, UT
Pavant Solar, LLC
Pavant Solar, LLC is a 50 MW solar power plant in Millard County, Utah, operated by Onward Energy. Its oldest generator still running came online in 2015. In 2025 it generated 114 GWh, about what 13,000 average Utah homes use in a year.
Pavant Solar, LLC in context
Among the 56 solar plants in Utah in the EIA's inventory, it is the 27th largest, about 1.6% of the state's 3.0 GW of solar capacity.
Millard County has 4 power plants of 1 MW or more with 1.2 GW in all; Pavant Solar, LLC is 4% of that and the largest of 3 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Millard County goes 4.1 hours a year without power, the 8th most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pavant Solar, LLC (outlined) and other plants in Millard County, shaded. 38.961, -112.363.
Plant facts
- Operator
- Onward Energy
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Millard County, UT
- EIA plant ID
- 59702
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 50 MW | 2015 | – |
Nearby
Other plants in Millard County
Questions
Pavant Solar, LLC, answered
How much power does Pavant Solar, LLC produce?
Pavant Solar, LLC has 50 MW of capacity from one generator. In 2025 it generated 114 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pavant Solar, LLC power?
Its 2025 output of 114 GWh equals the yearly electricity use of about 13,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pavant Solar, LLC?
Pavant Solar, LLC is in Millard County, Utah, at about 38.961°, -112.363°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Millard County goes 4.1 hours a year without power, the 8th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Pavant Solar, LLC?
It is operated by Onward Energy (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Pavant Solar, LLC open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.