Natural gas power plant · Millard, UT
Intermountain Power Project
Intermountain Power Project is a 1.1 GW natural gas power plant in Millard County, Utah, operated by Los Angeles Department of Water & Power. Its oldest generator still running came online in 2025. In 2025 it generated 4.8 TWh, about what 526,000 average Utah homes use in a year.
Intermountain Power Project in context
Among the 23 natural gas plants in Utah in the EIA's inventory, it is the 2nd largest, about 27% of the state's 4.1 GW of natural gas capacity.
Millard County has 4 power plants of 1 MW or more with 1.2 GW in all; Intermountain Power Project is 90% of that.
The average electricity customer in Millard County goes 4.1 hours a year without power, the 8th most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Intermountain Power Project (outlined) and other plants in Millard County, shaded. 39.510, -112.580.
Plant facts
- Operator
- Los Angeles Department of Water & Power
- Sector
- Electric Utility
- Grid operator
- LDWP
- County
- Millard County, UT
- EIA plant ID
- 6481
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 3 | Natural Gas Fired Combined Cycle | 547 MW | 2025 | – |
| 4 | Natural Gas Fired Combined Cycle | 547 MW | 2025 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 2 | Conventional Steam Coal | 820 MW | 1987 | 2025 |
| 1 | Conventional Steam Coal | 820 MW | 1986 | 2025 |
Nearby
Other plants in Millard County
Questions
Intermountain Power Project, answered
How much power does Intermountain Power Project produce?
Intermountain Power Project has 1.1 GW of capacity from 2 generators. In 2025 it generated 4.8 TWh.
How many homes does Intermountain Power Project power?
Its 2025 output of 4.8 TWh equals the yearly electricity use of about 526,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Intermountain Power Project?
Intermountain Power Project is in Millard County, Utah, at about 39.510°, -112.580°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Millard County goes 4.1 hours a year without power, the 8th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Intermountain Power Project?
It is operated by Los Angeles Department of Water & Power (EIA sector: Electric Utility), and it feeds the Los Angeles Department of Water and Power.
When did Intermountain Power Project open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.