Solar power plant · Millard, UT
Pavant Solar II LLC
Pavant Solar II LLC is a 50 MW solar power plant in Millard County, Utah, operated by Pavant Solar II LLC. Its oldest generator still running came online in 2016. In 2025 it generated 86 GWh, about what 9,400 average Utah homes use in a year.
Pavant Solar II LLC in context
Among the 56 solar plants in Utah in the EIA's inventory, it is the 28th largest, about 1.6% of the state's 3.0 GW of solar capacity.
Millard County has 4 power plants of 1 MW or more with 1.2 GW in all; Pavant Solar II LLC is 4% of that and the 2nd largest of 3 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Millard County goes 4.1 hours a year without power, the 8th most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pavant Solar II LLC (outlined) and other plants in Millard County, shaded. 39.163, -112.343.
Plant facts
- Operator
- Pavant Solar II LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Millard County, UT
- EIA plant ID
- 60449
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PSII | Solar Photovoltaic | 50 MW | 2016 | – |
Nearby
Other plants in Millard County
Questions
Pavant Solar II LLC, answered
How much power does Pavant Solar II LLC produce?
Pavant Solar II LLC has 50 MW of capacity from one generator. In 2025 it generated 86 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pavant Solar II LLC power?
Its 2025 output of 86 GWh equals the yearly electricity use of about 9,400 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pavant Solar II LLC?
Pavant Solar II LLC is in Millard County, Utah, at about 39.163°, -112.343°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Millard County goes 4.1 hours a year without power, the 8th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Pavant Solar II LLC?
It is operated by Pavant Solar II LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Pavant Solar II LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.