Solar power plant · Carbon, UT

Graphite Solar I

Graphite Solar I is a 80 MW solar power plant in Carbon County, Utah, operated by Greenbacker Renewable Energy Corporation. Its oldest generator still running came online in 2022. In 2025 it generated 188 GWh, about what 21,000 average Utah homes use in a year.

Capacity80 MWNameplate, September 2026
Generated188 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2022

Graphite Solar I in context

Among the 56 solar plants in Utah in the EIA's inventory, it is the 19th largest, about 2.6% of the state's 3.0 GW of solar capacity.

Carbon County has 2 power plants of 1 MW or more with 138 MW in all; Graphite Solar I is 58% of that.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Carbon County goes 2.3 hours a year without power, the 16th most of 23 counties in Utah. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0501001502002502022202320242025GWh 188
0501001502002502022202320242025188

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Graphite Solar I (outlined) and other plants in Carbon County, shaded. 39.548, -110.712.

Plant facts

Operator
Greenbacker Renewable Energy Corporation
Sector
IPP Non-CHP
Grid operator
PACE
County
Carbon County, UT
EIA plant ID
64186
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
394 Solar Photovoltaic 80 MW 2022 –

Nearby

Other plants in Carbon County

Questions

Graphite Solar I, answered

How much power does Graphite Solar I produce?

Graphite Solar I has 80 MW of capacity from one generator. In 2025 it generated 188 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Graphite Solar I power?

Its 2025 output of 188 GWh equals the yearly electricity use of about 21,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Graphite Solar I?

Graphite Solar I is in Carbon County, Utah, at about 39.548°, -110.712°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Carbon County goes 2.3 hours a year without power, the 16th most of 23 counties in Utah. The county's page has the full outage record.

Who operates Graphite Solar I?

It is operated by Greenbacker Renewable Energy Corporation (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Graphite Solar I open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.