Granite Mountain BESS East
Granite Mountain BESS East is a 80 MW storage power plant in Iron County, Utah, operated by Granite Mountain BESS East LLC. Its oldest generator still running came online in 2026.
Granite Mountain BESS East in context
Among the 7 storage plants in Utah in the EIA's inventory, it is the 7th largest, about 5.4% of the state's 1.5 GW of storage capacity.
Iron County has 21 power plants of 1 MW or more with 1.1 GW in all; Granite Mountain BESS East is 7% of that and the 3rd largest of 3 storage plants there.
The average electricity customer in Iron County goes 3.8 hours a year without power, the 9th most of 23 counties in Utah. The county's page has the full outage record.
Where it is
Granite Mountain BESS East (outlined) and other plants in Iron County, shaded. 37.774, -113.249.
Plant facts
- Operator
- Granite Mountain BESS East LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Iron County, UT
- EIA plant ID
- 69679
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GMEBA | Batteries | 80 MW · 80 MWh | 2026 | – |
Questions
Granite Mountain BESS East, answered
How much can Granite Mountain BESS East store and deliver?
Granite Mountain BESS East can deliver up to 80 MW and hold 80 MWh of energy, from one battery or storage system.
Where is Granite Mountain BESS East?
Granite Mountain BESS East is in Iron County, Utah, at about 37.774°, -113.249°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Iron County goes 3.8 hours a year without power, the 9th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Granite Mountain BESS East?
It is operated by Granite Mountain BESS East LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Granite Mountain BESS East open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.