Solar power plant · Iron, UT
Granite Mountain Solar East, LLC
Granite Mountain Solar East, LLC is a 80 MW solar power plant in Iron County, Utah, operated by Clearway Renewable Operation & Maintenance LLC. Its oldest generator still running came online in 2016. In 2025 it generated 203 GWh, about what 22,000 average Utah homes use in a year.
Granite Mountain Solar East, LLC in context
Among the 56 solar plants in Utah in the EIA's inventory, it is the 14th largest, about 2.6% of the state's 3.0 GW of solar capacity.
Iron County has 21 power plants of 1 MW or more with 1.1 GW in all; Granite Mountain Solar East, LLC is 7% of that and the 6th largest of 18 solar plants there.
Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Iron County goes 3.8 hours a year without power, the 9th most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Granite Mountain Solar East, LLC (outlined) and other plants in Iron County, shaded. 37.775, -113.226.
Plant facts
- Operator
- Clearway Renewable Operation & Maintenance LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Iron County, UT
- EIA plant ID
- 59946
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GMSE | Solar Photovoltaic | 80 MW | 2016 | – |
Questions
Granite Mountain Solar East, LLC, answered
How much power does Granite Mountain Solar East, LLC produce?
Granite Mountain Solar East, LLC has 80 MW of capacity from one generator. In 2025 it generated 203 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Granite Mountain Solar East, LLC power?
Its 2025 output of 203 GWh equals the yearly electricity use of about 22,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Granite Mountain Solar East, LLC?
Granite Mountain Solar East, LLC is in Iron County, Utah, at about 37.775°, -113.226°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Iron County goes 3.8 hours a year without power, the 9th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Granite Mountain Solar East, LLC?
It is operated by Clearway Renewable Operation & Maintenance LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Granite Mountain Solar East, LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.