Cove Mountain Solar 2 is a 122 MW solar power plant in Iron County, Utah, operated by Cove Mountain Solar 2 LLC. Its oldest generator still running came online in 2020. In 2025 it generated 321 GWh, about what 35,000 average Utah homes use in a year.

Capacity122 MWNameplate, September 2026
Generated321 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2020

Cove Mountain Solar 2 in context

Among the 56 solar plants in Utah in the EIA's inventory, it is the 4th largest, about 4.0% of the state's 3.0 GW of solar capacity.

Iron County has 21 power plants of 1 MW or more with 1.1 GW in all; Cove Mountain Solar 2 is 11% of that and the 2nd largest of 18 solar plants there.

Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Iron County goes 3.8 hours a year without power, the 9th most of 23 counties in Utah. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202020212022202320242025GWh 321
0100200300400202020212022202320242025321

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Cove Mountain Solar 2 (outlined) and other plants in Iron County, shaded. 37.639, -113.637.

Plant facts

Operator
Cove Mountain Solar 2 LLC
Sector
IPP Non-CHP
Grid operator
PACE
County
Iron County, UT
EIA plant ID
62470
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN01 Solar Photovoltaic 122 MW 2020 –

Questions

Cove Mountain Solar 2, answered

How much power does Cove Mountain Solar 2 produce?

Cove Mountain Solar 2 has 122 MW of capacity from one generator. In 2025 it generated 321 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Cove Mountain Solar 2 power?

Its 2025 output of 321 GWh equals the yearly electricity use of about 35,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Cove Mountain Solar 2?

Cove Mountain Solar 2 is in Iron County, Utah, at about 37.639°, -113.637°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Iron County goes 3.8 hours a year without power, the 9th most of 23 counties in Utah. The county's page has the full outage record.

Who operates Cove Mountain Solar 2?

It is operated by Cove Mountain Solar 2 LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Cove Mountain Solar 2 open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.