Solar power plant · Emery, UT

Hornshadow Solar, LLC

Hornshadow Solar, LLC is a 100 MW solar power plant in Emery County, Utah, operated by Hornshadow Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 149 GWh, about what 16,000 average Utah homes use in a year.

Capacity100 MWNameplate, September 2026
Generated149 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Hornshadow Solar, LLC in context

Among the 56 solar plants in Utah in the EIA's inventory, it is the 6th largest, about 3.3% of the state's 3.0 GW of solar capacity.

Emery County has 7 power plants of 1 MW or more with 3.7 GW in all; Hornshadow Solar, LLC is 3% of that and the 3rd largest of 4 solar plants there.

The average electricity customer in Emery County goes 3.1 hours a year without power, the 13th most of 23 counties in Utah. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hornshadow Solar, LLC (outlined) and other plants in Emery County, shaded. 39.182, -110.977.

Plant facts

Operator
Hornshadow Solar, LLC
Sector
IPP Non-CHP
Grid operator
PACE
County
Emery County, UT
EIA plant ID
67497
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HSL Solar Photovoltaic 100 MW 2025 –

Questions

Hornshadow Solar, LLC, answered

How much power does Hornshadow Solar, LLC produce?

Hornshadow Solar, LLC has 100 MW of capacity from one generator. In 2025 it generated 149 GWh.

How many homes does Hornshadow Solar, LLC power?

Its 2025 output of 149 GWh equals the yearly electricity use of about 16,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hornshadow Solar, LLC?

Hornshadow Solar, LLC is in Emery County, Utah, at about 39.182°, -110.977°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Emery County goes 3.1 hours a year without power, the 13th most of 23 counties in Utah. The county's page has the full outage record.

Who operates Hornshadow Solar, LLC?

It is operated by Hornshadow Solar, LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.

When did Hornshadow Solar, LLC open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.