Storage power plant · Emery, UT
Green River Energy Center - Hybrid
Green River Energy Center - Hybrid is a 800 MW storage power plant in Emery County, Utah, operated by Green River Energy Center, LLC. Its oldest generator still running came online in 2026.
Green River Energy Center - Hybrid in context
Among the 7 storage plants in Utah in the EIA's inventory, it is the largest, about 54% of the state's 1.5 GW of storage capacity.
Emery County has 7 power plants of 1 MW or more with 3.7 GW in all; Green River Energy Center - Hybrid is 21% of that.
The average electricity customer in Emery County goes 3.1 hours a year without power, the 13th most of 23 counties in Utah. The county's page has the full outage record.
Where it is
Green River Energy Center - Hybrid (outlined) and other plants in Emery County, shaded. 38.999, -111.117.
Plant facts
- Operator
- Green River Energy Center, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Emery County, UT
- EIA plant ID
- 67501
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GRBS | Batteries | 400 MW · 1,600 MWh | 2026 | – |
| GRPV | Solar Photovoltaic | 400 MW | 2026 | – |
Questions
Green River Energy Center - Hybrid, answered
How much can Green River Energy Center - Hybrid store and deliver?
Green River Energy Center - Hybrid can deliver up to 800 MW and hold 1,600 MWh of energy, from 2 storage units.
Where is Green River Energy Center - Hybrid?
Green River Energy Center - Hybrid is in Emery County, Utah, at about 38.999°, -111.117°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Emery County goes 3.1 hours a year without power, the 13th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Green River Energy Center - Hybrid?
It is operated by Green River Energy Center, LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Green River Energy Center - Hybrid open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.