Rocket Solar, LLC is a 80 MW solar power plant in Box Elder County, Utah, operated by Rocket Solar, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 211 GWh, about what 23,000 average Utah homes use in a year.
Rocket Solar, LLC in context
Among the 56 solar plants in Utah in the EIA's inventory, it is the 18th largest, about 2.6% of the state's 3.0 GW of solar capacity.
Box Elder County has 5 power plants of 1 MW or more with 195 MW in all; Rocket Solar, LLC is 41% of that and the largest of 3 solar plants there.
Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Box Elder County goes 4.3 hours a year without power, the 7th most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Rocket Solar, LLC (outlined) and other plants in Box Elder County, shaded. 41.636, -112.444.
Plant facts
- Operator
- Rocket Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Box Elder County, UT
- EIA plant ID
- 63983
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RS | Solar Photovoltaic | 80 MW | 2024 | – |
Nearby
Other plants in Box Elder County
Questions
Rocket Solar, LLC, answered
How much power does Rocket Solar, LLC produce?
Rocket Solar, LLC has 80 MW of capacity from one generator. In 2025 it generated 211 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Rocket Solar, LLC power?
Its 2025 output of 211 GWh equals the yearly electricity use of about 23,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rocket Solar, LLC?
Rocket Solar, LLC is in Box Elder County, Utah, at about 41.636°, -112.444°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Box Elder County goes 4.3 hours a year without power, the 7th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Rocket Solar, LLC?
It is operated by Rocket Solar, LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Rocket Solar, LLC open?
Its oldest generator still running came online in 2024.