Solar power plant · Box Elder, UT

Steel Solar LLC

Steel Solar LLC is a 80 MW solar power plant in Box Elder County, Utah, operated by Steel Solar, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 198 GWh, about what 22,000 average Utah homes use in a year.

Capacity80 MWNameplate, September 2026
Generated198 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2024

Steel Solar LLC in context

Among the 56 solar plants in Utah in the EIA's inventory, it is the 21st largest, about 2.6% of the state's 3.0 GW of solar capacity.

Box Elder County has 5 power plants of 1 MW or more with 195 MW in all; Steel Solar LLC is 41% of that and the 2nd largest of 3 solar plants there.

Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Box Elder County goes 4.3 hours a year without power, the 7th most of 23 counties in Utah. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020242025GWh 198
05010015020025020242025198

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Steel Solar LLC (outlined) and other plants in Box Elder County, shaded. 41.886, -112.182.

Plant facts

Operator
Steel Solar, LLC
Sector
IPP Non-CHP
Grid operator
WAUW
County
Box Elder County, UT
EIA plant ID
66267
Where Utah's power comes from → Utah power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SS8 Solar Photovoltaic 80 MW 2024 –

Nearby

Other plants in Box Elder County

Rocket Solar, LLC · 80 MWCutler Hydro · 30 MWSF Auto T1 · 3.1 MWBrigham City · 1.8 MW

Questions

Steel Solar LLC, answered

How much power does Steel Solar LLC produce?

Steel Solar LLC has 80 MW of capacity from one generator. In 2025 it generated 198 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Steel Solar LLC power?

Its 2025 output of 198 GWh equals the yearly electricity use of about 22,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Steel Solar LLC?

Steel Solar LLC is in Box Elder County, Utah, at about 41.886°, -112.182°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Box Elder County goes 4.3 hours a year without power, the 7th most of 23 counties in Utah. The county's page has the full outage record.

Who operates Steel Solar LLC?

It is operated by Steel Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority WAUW.

When did Steel Solar LLC open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.