Solar power plant · Box Elder, UT
Steel Solar LLC
Steel Solar LLC is a 80 MW solar power plant in Box Elder County, Utah, operated by Steel Solar, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 198 GWh, about what 22,000 average Utah homes use in a year.
Steel Solar LLC in context
Among the 56 solar plants in Utah in the EIA's inventory, it is the 21st largest, about 2.6% of the state's 3.0 GW of solar capacity.
Box Elder County has 5 power plants of 1 MW or more with 195 MW in all; Steel Solar LLC is 41% of that and the 2nd largest of 3 solar plants there.
Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Box Elder County goes 4.3 hours a year without power, the 7th most of 23 counties in Utah. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Steel Solar LLC (outlined) and other plants in Box Elder County, shaded. 41.886, -112.182.
Plant facts
- Operator
- Steel Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- WAUW
- County
- Box Elder County, UT
- EIA plant ID
- 66267
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SS8 | Solar Photovoltaic | 80 MW | 2024 | – |
Nearby
Other plants in Box Elder County
Questions
Steel Solar LLC, answered
How much power does Steel Solar LLC produce?
Steel Solar LLC has 80 MW of capacity from one generator. In 2025 it generated 198 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Steel Solar LLC power?
Its 2025 output of 198 GWh equals the yearly electricity use of about 22,000 average Utah homes (761 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Steel Solar LLC?
Steel Solar LLC is in Box Elder County, Utah, at about 41.886°, -112.182°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Box Elder County goes 4.3 hours a year without power, the 7th most of 23 counties in Utah. The county's page has the full outage record.
Who operates Steel Solar LLC?
It is operated by Steel Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority WAUW.
When did Steel Solar LLC open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Utah home's 761 kWh a month in 2025. Methodology.