Data centers · Maine
Data centers in Maine
4 operating data center sites, 5 projects planned or under construction.
The map
Every mapped site
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| Wiscasset Data Center (Proposed) | Unknown site evaluator under NDA | Lincoln | Planned | 714 MW | – |
| Sanford Woods Industrial and Technical Campus | Randy Gibbs | York | Planned | 300 MW | – |
| Green 4 Maine Data Center Campus | Green 4 Maine | Aroostook | Planned | 6 MW | 2026 |
| DeepGreen Western Passage Subsea AI Data Center | DeepGreen Western Passage SPV LLC | Washington | Planned | – | – |
| Scarborough Technology Park Data Center | Daniel Dickinson | Cumberland | Planned | – | – |
| Sentinel / JGT2 Androscoggin Mill Data Center | Sentinel Data Centers | Franklin | Cancelled | 82 MW | – |
| Nautilus Millinocket Data Center (Cancelled) | Nautilus Data Technologies | Penobscot | Cancelled | 60 MW | – |
| MillCompute Bates Mill AI Data Center | MillCompute LLC | Androscoggin | Cancelled | – | – |
Local pushback
Bans and moratoriums
9 recorded as enacted, 2 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Bucksport · Hancock | Local | Enacted | Oct 8, 2026 | A stated duration, but the end date isn't recorded here |
| Biddeford · York | City | Proposed | Sep 3, 2026 | No end date by design — a permanent ban or standing statute |
| Ellsworth · Hancock | Local | Enacted | Aug 17, 2026 | to Feb 13, 2027 |
| Eastport · Washington | Local | Enacted | Aug 12, 2026 | to Feb 8, 2027 |
| Sanford · York | Local | Enacted | Aug 5, 2026 | to Jan 31, 2027 |
| Scarborough · Cumberland | Town | Enacted | Jun 3, 2026 | to Nov 30, 2026 |
| Brunswick · Cumberland | Town | Enacted | Jun 2, 2026 | to Nov 29, 2026 |
| Westbrook · Cumberland | City | Enacted | Jun 1, 2026 | to Nov 28, 2026 |
| Maine (statewide) · Kennebec | State | Vetoed | Apr 24, 2026 | Term not documented |
| Bangor · Penobscot | Local | Enacted | Apr 13, 2026 | A stated duration, but the end date isn't recorded here |
| Gorham · Cumberland | Local | Enacted | Jan 1, 2026 | to Nov 29, 2026 |
| North Berwick · York | Local | Proposed | – | Term not documented |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Cumberland County | 2 | 12 h |
| Aroostook County | 1 | 7.2 h |
| Kennebec County | 1 | 16 h |
Every named site
The list
4 of 4 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| Oxford Networks | FirstLight | Cumberland | Building | 1.3 |
| Datacenter | – | Aroostook | Building | 0.2 |
| FirstLight Data Center | FirstLight | Cumberland | Point | – |
| Oit Data Center | – | Kennebec | EPA record | – |
How many data centers are in Maine?
4 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 46th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Maine?
0 under construction and 5 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 1.0 GW. 3 projects have been cancelled.
Which Maine county has the most data centers?
Cumberland County, with 2 operating sites, then Aroostook County (1) and Kennebec County (1).
Who operates data centers in Maine?
Among sites that name an operator: FirstLight (2).
What do Maine households pay for electricity?
27.7¢ per kWh on average in 2025 (US: 17.2¢), up 64% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.