Data centers · Maine

Data centers in Maine

4 operating data center sites, 5 projects planned or under construction.

Operating sites40 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline50 under construction, 5 planned
Home price27.7¢/kWh+64% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Wiscasset Data Center (Proposed) Unknown site evaluator under NDA Lincoln Planned 714 MW –
Sanford Woods Industrial and Technical Campus Randy Gibbs York Planned 300 MW –
Green 4 Maine Data Center Campus Green 4 Maine Aroostook Planned 6 MW 2026
DeepGreen Western Passage Subsea AI Data Center DeepGreen Western Passage SPV LLC Washington Planned – –
Scarborough Technology Park Data Center Daniel Dickinson Cumberland Planned – –
Sentinel / JGT2 Androscoggin Mill Data Center Sentinel Data Centers Franklin Cancelled 82 MW –
Nautilus Millinocket Data Center (Cancelled) Nautilus Data Technologies Penobscot Cancelled 60 MW –
MillCompute Bates Mill AI Data Center MillCompute LLC Androscoggin Cancelled – –

Local pushback

Bans and moratoriums

9 recorded as enacted, 2 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Bucksport · Hancock Local Enacted Oct 8, 2026 A stated duration, but the end date isn't recorded here
Biddeford · York City Proposed Sep 3, 2026 No end date by design — a permanent ban or standing statute
Ellsworth · Hancock Local Enacted Aug 17, 2026 to Feb 13, 2027
Eastport · Washington Local Enacted Aug 12, 2026 to Feb 8, 2027
Sanford · York Local Enacted Aug 5, 2026 to Jan 31, 2027
Scarborough · Cumberland Town Enacted Jun 3, 2026 to Nov 30, 2026
Brunswick · Cumberland Town Enacted Jun 2, 2026 to Nov 29, 2026
Westbrook · Cumberland City Enacted Jun 1, 2026 to Nov 28, 2026
Maine (statewide) · Kennebec State Vetoed Apr 24, 2026 Term not documented
Bangor · Penobscot Local Enacted Apr 13, 2026 A stated duration, but the end date isn't recorded here
Gorham · Cumberland Local Enacted Jan 1, 2026 to Nov 29, 2026
North Berwick · York Local Proposed – Term not documented

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Cumberland County212 h
Aroostook County17.2 h
Kennebec County116 h

Every named site

The list

4 of 4 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Oxford Networks FirstLight Cumberland Building 1.3
Datacenter – Aroostook Building 0.2
FirstLight Data Center FirstLight Cumberland Point –
Oit Data Center – Kennebec EPA record –

How many data centers are in Maine?

4 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 46th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Maine?

0 under construction and 5 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 1.0 GW. 3 projects have been cancelled.

Which Maine county has the most data centers?

Cumberland County, with 2 operating sites, then Aroostook County (1) and Kennebec County (1).

Who operates data centers in Maine?

Among sites that name an operator: FirstLight (2).

What do Maine households pay for electricity?

27.7¢ per kWh on average in 2025 (US: 17.2¢), up 64% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.