Where the power comes from · 2025
Maine
Natural gas made 39% of the electricity generated in Maine in 2025, the 23rd highest natural gas share of any state.
The mix
Maine's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Maine's power plants
276 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Maine, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Maine's power plants emitted 221 kg of CO₂ for each MWh they generated in 2024, against 377 kg in 2005: the 8th lowest of 51. 3.3 million metric tons in all.
Maine among the states
- Generation14.8 TWh45th
- Renewable share58%7th
- Carbon-free share58%12th
- Cleanest electricity (kg CO₂/MWh, 2024)2218th
- Natural gas share39%23rd
- Wind share20%13th
- Hydro share17%9th
- Other share14%5th
Plants
The largest plants in Maine
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| William F Wyman Hybrid | Oil | Cumberland | 863 MW | 138 GWh | 2% | 1957 |
| Westbrook Energy Center Power Plant | Natural gas | Cumberland | 564 MW | 3.4 TWh | 69% | 2001 |
| Maine Independence Station | Natural gas | Penobscot | 550 MW | 1.4 TWh | 30% | 2000 |
| Rumford Power LLC | Natural gas | Oxford | 275 MW | 793 GWh | 33% | 2000 |
| Bucksport Generation LLC | Natural gas | Hancock | 187 MW | 11 GWh | 1% | 2001 |
| Bingham Wind | Wind | Piscataquis | 186 MW | 499 GWh | 31% | 2016 |
| Cross Town Energy Storage | Storage | Cumberland | 175 MW | -2.0 GWh | – | 2025 |
| Great Lakes Hydro America - ME | Hydro | Penobscot | 158 MW | 500 GWh | 36% | 1917 |
| Oakfield Wind Project | Wind | Aroostook | 148 MW | 351 GWh | 27% | 2015 |
| Kibby Wind Facility | Wind | Franklin | 132 MW | 262 GWh | 23% | 2009 |
| Downeast Wind | Wind | Washington | 126 MW | 264 GWh | – | 2025 |
| Three Corners Solar | Solar | Waldo | 110 MW | 187 GWh | 19% | 2024 |
| Somerset Plant | Biomass | Somerset | 107 MW | 552 GWh | 59% | 1976 |
| Rumford Cogeneration | Biomass | Oxford | 103 MW | 424 GWh | 47% | 1990 |
| Farmington Solar | Solar | Franklin | 77 MW | 124 GWh | 18% | 2021 |
| Harris Hydro | Hydro | Somerset | 76 MW | 151 GWh | 23% | 1954 |
| Weaver Wind | Wind | Hancock | 73 MW | 229 GWh | 36% | 2020 |
| Wyman Hydro | Hydro | Somerset | 72 MW | 295 GWh | 47% | 1930 |
| S D Warren Westbrook | Biomass | Cumberland | 70 MW | 15 GWh | 3% | 1903 |
| Woodland Pulp, LLC | Biomass | Washington | 68 MW | 344 GWh | 57% | 1906 |
| Rollins Wind Project | Wind | Penobscot | 60 MW | 147 GWh | 28% | 2011 |
| Moscow | Wind | Somerset | 59 MW | 43 GWh | – | 2025 |
| Stetson Wind I | Wind | Washington | 57 MW | 146 GWh | 29% | 2009 |
| Rumford Falls Hydro Facility | Hydro | Oxford | 53 MW | 212 GWh | 46% | 1918 |
| Hancock Wind Plant | Wind | Hancock | 51 MW | 120 GWh | 27% | 2016 |
| Record Hill Wind | Wind | Oxford | 51 MW | 110 GWh | 25% | 2012 |
| Sanford Solar | Solar | York | 49 MW | 86 GWh | 20% | 2020 |
| ReEnergy Stratton LLC | Biomass | Franklin | 47 MW | 200 GWh | 49% | 1989 |
| Passadumkeag Windpark LLC | Wind | Penobscot | 43 MW | 141 GWh | 37% | 2016 |
| Mars Hill Wind Farm Project | Wind | Aroostook | 42 MW | 128 GWh | 35% | 2007 |
| ReEnergy Livermore Falls | Biomass | Androscoggin | 40 MW | 274 GWh | 79% | 1992 |
| Cape Gas Turbine | Oil | Cumberland | 35 MW | 0.8 GWh | 0% | 1970 |
| Bull Hill Wind Project | Wind | Hancock | 35 MW | 67 GWh | 22% | 2012 |
| Saddleback Ridge Wind Farm | Wind | Franklin | 34 MW | 90 GWh | 30% | 2014 |
| Anson Abenaki Hydros | Hydro | Somerset | 29 MW | 101 GWh | 40% | 1950 |
| Red Shield Envir Old Town Facility | Biomass | Penobscot | 29 MW | 0.0 GWh | – | 1965 |
| Charles E Monty | Hydro | Androscoggin | 28 MW | 114 GWh | 46% | 1990 |
| NE Renewable Power Jonesboro | Biomass | Washington | 28 MW | 0.0 GWh | – | 1987 |
| NE Renewable Power West Enfield | Biomass | Penobscot | 28 MW | 43 GWh | 18% | 1987 |
| Stetson Wind II | Wind | Washington | 26 MW | 55 GWh | 25% | 2010 |
| Eagle Point Energy Center | Biomass | Penobscot | 25 MW | 0.0 GWh | – | 1987 |
| Canton Mountain Wind | Wind | Oxford | 23 MW | 56 GWh | 28% | 2017 |
| Twin Rivers Paper Co LLC | Other | Aroostook | 22 MW | 99 GWh | 51% | 1987 |
| Spruce Mountain WInd | Wind | Oxford | 20 MW | 53 GWh | 30% | 2011 |
| Milo PV - BD Solar 1 LLC | Solar | Piscataquis | 20 MW | 25 GWh | 14% | 2021 |
| Silver Maple | Wind | Penobscot | 20 MW | 64 GWh | 37% | 2022 |
| Walden Solar Maine V | Solar | Androscoggin | 20 MW | 36 GWh | 21% | 2024 |
| Mousam River Solar | Solar | York | 20 MW | 6.9 GWh | – | 2025 |
| Brunswick Hydro | Hydro | Cumberland | 20 MW | 70 GWh | 41% | 1982 |
| Worumbo Hydro Station | Hydro | Androscoggin | 19 MW | 74 GWh | 44% | 1989 |
| Gulf Island | Hydro | Androscoggin | 19 MW | 115 GWh | 68% | 1926 |
| Skelton | Hydro | York | 17 MW | 77 GWh | 53% | 1948 |
| Hydro Kennebec Project | Hydro | Kennebec | 15 MW | 32 GWh | 24% | 1989 |
| RoxWind | Wind | Oxford | 15 MW | 44 GWh | 33% | 2021 |
| Bonny Eagle | Storage | York | 15 MW | 31 GWh | – | 1910 |
| Pejepscot Hydroelectric Project | Hydro | Sagadahoc | 14 MW | 50 GWh | 42% | 1987 |
| Regional Waste Systems | Biomass | Cumberland | 13 MW | 89 GWh | 76% | 1988 |
| Williams Hydro | Hydro | Somerset | 13 MW | 64 GWh | 56% | 1939 |
| West Enfield Hydro | Hydro | Penobscot | 13 MW | 70 GWh | 62% | 1988 |
| Weston Hydro | Hydro | Somerset | 12 MW | 57 GWh | 54% | 1920 |
| Hiram | Hydro | Cumberland | 11 MW | 31 GWh | 34% | 1917 |
| Otis Hydro | Hydro | Franklin | 10 MW | 31 GWh | 35% | 1985 |
| Georges River Energy | Biomass | Waldo | 10 MW | 51 GWh | 58% | 2018 |
| Pittsfield Solar LLC | Solar | Somerset | 9.9 MW | 16 GWh | 18% | 2017 |
| International Paper Livermore Hydro | Hydro | Androscoggin | 9.2 MW | 24 GWh | 30% | 1910 |
| Oxford PV - BD Solar Oxford LLC | Solar | Oxford | 9.2 MW | 13 GWh | 16% | 2021 |
| Pisgah Mountain Wind | Wind | Penobscot | 9.1 MW | 28 GWh | 36% | 2016 |
| Ellsworth Hydro Station | Hydro | Hancock | 8.9 MW | 18 GWh | 24% | 1924 |
| Shawmut | Hydro | Somerset | 8.8 MW | 23 GWh | 30% | 1913 |
| Athens Energy | Biomass | Somerset | 8.5 MW | 56 GWh | 76% | 2016 |
| Milford Hydro Station | Hydro | Penobscot | 7.8 MW | 36 GWh | 53% | 1941 |
| West Buxton | Hydro | York | 7.7 MW | 21 GWh | 31% | 1904 |
| Lockwood Hydroelectric Facility | Hydro | Kennebec | 7.2 MW | 13 GWh | 21% | 1985 |
| Augusta PV - BD Solar Augusta LLC | Solar | Kennebec | 7.2 MW | 9.3 GWh | 15% | 2021 |
| BD Solar Hancock LLC | Solar | Hancock | 7.0 MW | 11 GWh | 18% | 2022 |
| Winslow PV - BD Solar 2 LLC | Solar | Kennebec | 7.0 MW | 10 GWh | 17% | 2022 |
| BD Solar Ellsworth LLC | Solar | Hancock | 7.0 MW | 9.0 GWh | 15% | 2022 |
| Aziscohos Hydroelectric Project | Hydro | Oxford | 6.7 MW | 30 GWh | 51% | 1988 |
| Cataract Hydro | Hydro | York | 6.6 MW | 23 GWh | 40% | 1937 |
| International Paper Riley Hydro | Hydro | Franklin | 6.6 MW | 20 GWh | 34% | 1981 |
| Deer Rips | Hydro | Androscoggin | 6.5 MW | 51 GWh | 89% | 1903 |
| MMWAC Resource Recovery Facility | Biomass | Androscoggin | 5.0 MW | 10 GWh | 23% | 1992 |
| Fairfield PV - BD Solar Fairfield LLC | Solar | Somerset | 5.0 MW | 8.7 GWh | 20% | 2021 |
| Palmyra PV - BD Solar Palmyra LLC | Solar | Somerset | 5.0 MW | 8.1 GWh | 19% | 2022 |
| River Road | Solar | Somerset | 5.0 MW | 8.1 GWh | 19% | 2022 |
| Gorham Solar 1 (CSG) | Solar | Cumberland | 5.0 MW | 6.6 GWh | 15% | 2023 |
| Unity Solar | Solar | Waldo | 5.0 MW | 6.7 GWh | 15% | 2021 |
| Baldwin (ME) | Solar | Cumberland | 5.0 MW | 9.6 GWh | 22% | 2022 |
| Monmouth | Solar | Kennebec | 5.0 MW | 9.5 GWh | 22% | 2022 |
| Dynamic Corinth (CSG) | Solar | Penobscot | 5.0 MW | 9.8 GWh | 22% | 2022 |
| Dynamic Madison (CSG) | Solar | Somerset | 5.0 MW | 9.5 GWh | 22% | 2022 |
| Water Street Solar | Solar | Kennebec | 5.0 MW | 7.2 GWh | 16% | 2022 |
| AES Daigle Solar, LLC | Solar | Aroostook | 5.0 MW | 6.4 GWh | 15% | 2023 |
| Cenergy - Pulk | Solar | Androscoggin | 5.0 MW | 7.6 GWh | 17% | 2024 |
| Cenergy - Waterville (CSG) | Solar | Kennebec | 5.0 MW | 8.8 GWh | 20% | 2023 |
| Cenergy - Wiscasset (CSG) | Solar | Lincoln | 5.0 MW | 8.4 GWh | 19% | 2023 |
| ME Novel Lighthouse - Carrabassett | Solar | Franklin | 5.0 MW | 7.2 GWh | 16% | 2023 |
| Fort Fairfield | Solar | Aroostook | 5.0 MW | 8.1 GWh | 19% | 2023 |
| Our Katahdin | Solar | Penobscot | 5.0 MW | 5.8 GWh | 13% | 2024 |
| ME - EDFR - Phase I - Bristol | Solar | Lincoln | 5.0 MW | 8.5 GWh | 19% | 2023 |
Coming next
Planned projects
The largest generators reported as planned in Maine, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Freedom Pine Solar | Solar | York | 250 MW | 2029 |
| Three Rivers Solar Power, LLC | Solar | Hancock | 100 MW | 2026 |
| Warren Meadow Solar Station | Solar | Knox | 75 MW | 2028 |
| Crooked Trail Solar | Solar | Penobscot | 68 MW | 2029 |
| Turner Meadow Solar Station | Solar | Androscoggin | 20 MW | 2028 |
| Topsham Meadow Solar Station | Solar | Sagadahoc | 17 MW | 2028 |
| West Baldwin Solar Station | Solar | Cumberland | 17 MW | 2028 |
| Emery Meadow Solar Station | Solar | York | 16 MW | 2027 |
| South Portland ESS, LLC | Storage | Cumberland | 10 MW | 2027 |
| Sanford ESS, LLC | Storage | York | 5.0 MW | 2027 |
| Auburn PV - BD Solar Auburn LLC | Solar | Androscoggin | 5.0 MW | 2028 |
| Lewiston Jn PV - BD Solar Lewiston Jn LL | Solar | Androscoggin | 5.0 MW | 2028 |
| Hogs Bay | Solar | Hancock | 2.0 MW | 2026 |
| Emery Shute Solar One | Solar | Waldo | 1.0 MW | 2026 |
Shut down
Retired since 2010
The largest generators retired in Maine since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Bucksport Generation LLC | Natural gas | 72 MW | 2018 |
| Androscoggin Energy Center | Natural gas | 55 MW | 2025 |
| Androscoggin Energy Center | Natural gas | 55 MW | 2025 |
| Androscoggin Energy Center | Natural gas | 55 MW | 2025 |
| ReEnergy Ashland | Biomass | 40 MW | 2019 |
| ReEnergy Fort Fairfield | Biomass | 38 MW | 2019 |
| Millinocket Mill | Oil | 32 MW | 2013 |
| East Millinocket Mill | Biomass | 30 MW | 2019 |
| Androscoggin Mill | Natural gas | 30 MW | 2023 |
| Androscoggin Mill | Natural gas | 25 MW | 2023 |
| Androscoggin Mill | Natural gas | 25 MW | 2023 |
| Bucksport Generation LLC | Natural gas | 24 MW | 2018 |
| Millinocket Mill | Oil | 24 MW | 2013 |
| Maine Energy Recovery | Biomass | 22 MW | 2012 |
| Worcester Energy | Biomass | 19 MW | 2013 |
| Bucksport Generation LLC | Biomass | 16 MW | 2017 |
| East Millinocket Mill | Biomass | 16 MW | 2019 |
| East Millinocket Mill | Biomass | 16 MW | 2019 |
| Greenville Steam | Biomass | 16 MW | 2015 |
| Millinocket Mill | Oil | 16 MW | 2013 |
| Millinocket Mill | Oil | 16 MW | 2013 |
| Lincoln Paper & Tissue | Biomass | 14 MW | 2015 |
| Mead Rumford Cogen | Natural gas | 13 MW | 2022 |
| Caribou Generation Station | Oil | 12 MW | 2019 |
| Red Shield Envir Old Town Facility | Natural gas | 9.5 MW | 2013 |
| Caribou Generation Station | Oil | 7.5 MW | 2019 |
| Worcester Energy | Biomass | 7.2 MW | 2013 |
| Androscoggin 3 | Hydro | 4.9 MW | 2020 |
| Lincoln Paper & Tissue | Biomass | 4.0 MW | 2013 |
| Anson Abenaki Hydros | Natural gas | 3.0 MW | 2016 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.