Harris Hydro is a 76 MW hydro power plant in Somerset County, Maine, operated by Brookfield White Pine Hydro LLC. Its oldest generator still running came online in 1954. In 2025 it generated 151 GWh, about what 24,000 average Maine homes use in a year.

Capacity76 MWNameplate, September 2026
Generated151 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators4Oldest from 1954

Harris Hydro in context

Among the 48 hydro plants in Maine in the EIA's inventory, it is the 2nd largest, about 11% of the state's 700 MW of hydro capacity.

Somerset County has 37 power plants of 1 MW or more with 498 MW in all; Harris Hydro is 15% of that and the largest of 8 hydro plants there.

Its capacity factor of 23% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in Somerset County goes 42 hours a year without power, the 2nd most of 16 counties in Maine. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 151
01002003004002019202120232025151

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Harris Hydro (outlined) and other plants in Somerset County, shaded. 45.459, -69.866.

Plant facts

Operator
Brookfield White Pine Hydro LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Somerset County, ME
EIA plant ID
1492
Where Maine's power comes from → Maine power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HA2 Conventional Hydroelectric 30 MW 1954 –
HA3 Conventional Hydroelectric 30 MW 1955 –
HA1 Conventional Hydroelectric 15 MW 1954 –
HA4 Conventional Hydroelectric 1.4 MW 1955 –

Nearby

Other plants in Somerset County

Questions

Harris Hydro, answered

How much power does Harris Hydro produce?

Harris Hydro has 76 MW of capacity from 4 generators. In 2025 it generated 151 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Harris Hydro power?

Its 2025 output of 151 GWh equals the yearly electricity use of about 24,000 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Harris Hydro?

Harris Hydro is in Somerset County, Maine, at about 45.459°, -69.866°. It is one of 37 power plants of 1 MW or more in the county. The average electricity customer in Somerset County goes 42 hours a year without power, the 2nd most of 16 counties in Maine. The county's page has the full outage record.

Who operates Harris Hydro?

It is operated by Brookfield White Pine Hydro LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Harris Hydro open?

Its oldest generator still running came online in 1954.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.