Storage power plant · York, ME
Bonny Eagle
Bonny Eagle is a 15 MW storage power plant in York County, Maine, operated by Brookfield White Pine Hydro LLC. Its oldest generator still running came online in 1910. In 2025 it generated 31 GWh, about what 4,900 average Maine homes use in a year.
Bonny Eagle in context
Among the 5 storage plants in Maine in the EIA's inventory, it is the 2nd largest, about 7.5% of the state's 202 MW of storage capacity.
York County has 17 power plants of 1 MW or more with 158 MW in all; Bonny Eagle is 10% of that.
The average electricity customer in York County goes 30 hours a year without power, the 6th most of 16 counties in Maine. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Bonny Eagle (outlined) and other plants in York County, shaded. 43.688, -70.612.
Plant facts
- Operator
- Brookfield White Pine Hydro LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- York County, ME
- EIA plant ID
- 1482
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BES1 | Batteries | 8.0 MW · 16 MWh | 2023 | – |
| 1 | Conventional Hydroelectric | 1.2 MW | 1910 | – |
| 2 | Conventional Hydroelectric | 1.2 MW | 1910 | – |
| 3 | Conventional Hydroelectric | 1.2 MW | 1910 | – |
| 4 | Conventional Hydroelectric | 1.2 MW | 1910 | – |
| 5 | Conventional Hydroelectric | 1.2 MW | 1910 | – |
| 6 | Conventional Hydroelectric | 1.2 MW | 1910 | – |
Nearby
Other plants in York County
Questions
Bonny Eagle, answered
How much can Bonny Eagle store and deliver?
Bonny Eagle can deliver up to 15 MW and hold 16 MWh of energy, from 7 storage units. Its net energy in 2025 was 31 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Bonny Eagle?
Bonny Eagle is in York County, Maine, at about 43.688°, -70.612°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in York County goes 30 hours a year without power, the 6th most of 16 counties in Maine. The county's page has the full outage record.
Who operates Bonny Eagle?
It is operated by Brookfield White Pine Hydro LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Bonny Eagle open?
Its oldest generator still running came online in 1910.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.