Solar power plant · York, ME
Sanford Solar
Sanford Solar is a 49 MW solar power plant in York County, Maine, operated by Sanford Airport Solar, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 86 GWh, about what 13,000 average Maine homes use in a year.
Sanford Solar in context
Among the 177 solar plants in Maine in the EIA's inventory, it is the 3rd largest, about 5.1% of the state's 968 MW of solar capacity.
York County has 17 power plants of 1 MW or more with 158 MW in all; Sanford Solar is 31% of that and the largest of 12 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in York County goes 30 hours a year without power, the 6th most of 16 counties in Maine. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sanford Solar (outlined) and other plants in York County, shaded. 43.457, -70.780.
Plant facts
- Operator
- Sanford Airport Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- York County, ME
- EIA plant ID
- 63667
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SAS | Solar Photovoltaic | 49 MW | 2020 | – |
Nearby
Other plants in York County
Questions
Sanford Solar, answered
How much power does Sanford Solar produce?
Sanford Solar has 49 MW of capacity from one generator. In 2025 it generated 86 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sanford Solar power?
Its 2025 output of 86 GWh equals the yearly electricity use of about 13,000 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sanford Solar?
Sanford Solar is in York County, Maine, at about 43.457°, -70.780°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in York County goes 30 hours a year without power, the 6th most of 16 counties in Maine. The county's page has the full outage record.
Who operates Sanford Solar?
It is operated by Sanford Airport Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Sanford Solar open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.