Solar power plant · York, ME

Mousam River Solar

Mousam River Solar is a 20 MW solar power plant in York County, Maine, operated by Walden Renewables Development LLC. Its oldest generator still running came online in 2025. In 2025 it generated 6.9 GWh, about what 1,100 average Maine homes use in a year.

Capacity20 MWNameplate, September 2026
Generated6.9 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Mousam River Solar in context

Among the 177 solar plants in Maine in the EIA's inventory, it is the 6th largest, about 2.1% of the state's 968 MW of solar capacity.

York County has 17 power plants of 1 MW or more with 158 MW in all; Mousam River Solar is 13% of that and the 2nd largest of 12 solar plants there.

The average electricity customer in York County goes 30 hours a year without power, the 6th most of 16 counties in Maine. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mousam River Solar (outlined) and other plants in York County, shaded. 43.432, -70.727.

Plant facts

Operator
Walden Renewables Development LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
York County, ME
EIA plant ID
69499
Where Maine's power comes from → Maine power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MRS1 Solar Photovoltaic 20 MW 2025 –

Nearby

Other plants in York County

Sanford Solar · 49 MWSkelton · 17 MWBonny Eagle · 15 MWWest Buxton · 7.7 MWCataract Hydro · 6.6 MWQuarry · 5.0 MWSanford CGA · 5.0 MWSanford -NY · 4.9 MW

Questions

Mousam River Solar, answered

How much power does Mousam River Solar produce?

Mousam River Solar has 20 MW of capacity from one generator. In 2025 it generated 6.9 GWh.

How many homes does Mousam River Solar power?

Its 2025 output of 6.9 GWh equals the yearly electricity use of about 1,100 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mousam River Solar?

Mousam River Solar is in York County, Maine, at about 43.432°, -70.727°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in York County goes 30 hours a year without power, the 6th most of 16 counties in Maine. The county's page has the full outage record.

Who operates Mousam River Solar?

It is operated by Walden Renewables Development LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Mousam River Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.