Wind power plant · Hancock, ME
Bull Hill Wind Project
Bull Hill Wind Project is a 35 MW wind power plant in Hancock County, Maine, operated by Evergreen Wind, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 67 GWh, about what 10,000 average Maine homes use in a year.
Bull Hill Wind Project in context
Among the 22 wind plants in Maine in the EIA's inventory, it is the 13th largest, about 2.8% of the state's 1.2 GW of wind capacity.
Hancock County has 12 power plants of 1 MW or more with 388 MW in all; Bull Hill Wind Project is 9% of that and the 3rd largest of 3 wind plants there.
Its capacity factor of 22% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Hancock County goes 41 hours a year without power, the 3rd most of 16 counties in Maine. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bull Hill Wind Project (outlined) and other plants in Hancock County, shaded. 44.723, -68.243.
Plant facts
- Operator
- Evergreen Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Hancock County, ME
- EIA plant ID
- 57083
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 35 MW | 2012 | – |
Nearby
Other plants in Hancock County
Questions
Bull Hill Wind Project, answered
How much power does Bull Hill Wind Project produce?
Bull Hill Wind Project has 35 MW of capacity from one generator. In 2025 it generated 67 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bull Hill Wind Project power?
Its 2025 output of 67 GWh equals the yearly electricity use of about 10,000 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bull Hill Wind Project?
Bull Hill Wind Project is in Hancock County, Maine, at about 44.723°, -68.243°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Hancock County goes 41 hours a year without power, the 3rd most of 16 counties in Maine. The county's page has the full outage record.
Who operates Bull Hill Wind Project?
It is operated by Evergreen Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Bull Hill Wind Project open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.