Wind power plant · Penobscot, ME

Rollins Wind Project

Rollins Wind Project is a 60 MW wind power plant in Penobscot County, Maine, operated by Evergreen Wind, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 147 GWh, about what 23,000 average Maine homes use in a year.

Capacity60 MWNameplate, September 2026
Generated147 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2011

Rollins Wind Project in context

Among the 22 wind plants in Maine in the EIA's inventory, it is the 6th largest, about 4.9% of the state's 1.2 GW of wind capacity.

Penobscot County has 36 power plants of 1 MW or more with 1.0 GW in all; Rollins Wind Project is 6% of that and the largest of 4 wind plants there.

Its capacity factor of 28% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Penobscot County goes 21 hours a year without power, the 11th most of 16 counties in Maine. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 147
0501001502002019202120232025147

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Rollins Wind Project (outlined) and other plants in Penobscot County, shaded. 45.346, -68.380.

Plant facts

Operator
Evergreen Wind, LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Penobscot County, ME
EIA plant ID
56990
Where Maine's power comes from → Maine power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 60 MW 2011 –

Questions

Rollins Wind Project, answered

How much power does Rollins Wind Project produce?

Rollins Wind Project has 60 MW of capacity from one generator. In 2025 it generated 147 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Rollins Wind Project power?

Its 2025 output of 147 GWh equals the yearly electricity use of about 23,000 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Rollins Wind Project?

Rollins Wind Project is in Penobscot County, Maine, at about 45.346°, -68.380°. It is one of 36 power plants of 1 MW or more in the county. The average electricity customer in Penobscot County goes 21 hours a year without power, the 11th most of 16 counties in Maine. The county's page has the full outage record.

Who operates Rollins Wind Project?

It is operated by Evergreen Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Rollins Wind Project open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.