Hydro power plant · Sagadahoc, ME
Pejepscot Hydroelectric Project
Pejepscot Hydroelectric Project is a 14 MW hydro power plant in Sagadahoc County, Maine, operated by Topsham Hydro Partners. Its oldest generator still running came online in 1987. In 2025 it generated 50 GWh, about what 7,800 average Maine homes use in a year.
Pejepscot Hydroelectric Project in context
Among the 48 hydro plants in Maine in the EIA's inventory, it is the 12th largest, about 1.9% of the state's 700 MW of hydro capacity.
Sagadahoc County has 4 power plants of 1 MW or more with 24 MW in all; Pejepscot Hydroelectric Project is 56% of that.
Its capacity factor of 42% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Sagadahoc County goes 26 hours a year without power, the 10th most of 16 counties in Maine. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pejepscot Hydroelectric Project (outlined) and other plants in Sagadahoc County, shaded. 43.957, -70.024.
Plant facts
- Operator
- Topsham Hydro Partners
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Sagadahoc County, ME
- EIA plant ID
- 50758
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | 12 MW | 1987 | – |
| GEN4 | Conventional Hydroelectric | 0.5 MW | 1987 | – |
| GEN2 | Conventional Hydroelectric | 0.4 MW | 1987 | – |
| GEN3 | Conventional Hydroelectric | 0.3 MW | 1987 | – |
Nearby
Other plants in Sagadahoc County
Questions
Pejepscot Hydroelectric Project, answered
How much power does Pejepscot Hydroelectric Project produce?
Pejepscot Hydroelectric Project has 14 MW of capacity from 4 generators. In 2025 it generated 50 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pejepscot Hydroelectric Project power?
Its 2025 output of 50 GWh equals the yearly electricity use of about 7,800 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pejepscot Hydroelectric Project?
Pejepscot Hydroelectric Project is in Sagadahoc County, Maine, at about 43.957°, -70.024°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Sagadahoc County goes 26 hours a year without power, the 10th most of 16 counties in Maine. The county's page has the full outage record.
Who operates Pejepscot Hydroelectric Project?
It is operated by Topsham Hydro Partners (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Pejepscot Hydroelectric Project open?
Its oldest generator still running came online in 1987.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.