Wind power plant · Aroostook, ME
Mars Hill Wind Farm Project
Mars Hill Wind Farm Project is a 42 MW wind power plant in Aroostook County, Maine, operated by Evergreen Wind, LLC. Its oldest generator still running came online in 2007. In 2025 it generated 128 GWh, about what 20,000 average Maine homes use in a year.
Mars Hill Wind Farm Project in context
Among the 22 wind plants in Maine in the EIA's inventory, it is the 12th largest, about 3.5% of the state's 1.2 GW of wind capacity.
Aroostook County has 27 power plants of 1 MW or more with 293 MW in all; Mars Hill Wind Farm Project is 14% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Aroostook County goes 7.2 hours a year without power, the 16th most of 16 counties in Maine. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mars Hill Wind Farm Project (outlined) and other plants in Aroostook County, shaded. 46.544, -67.811.
Plant facts
- Operator
- Evergreen Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NBSO
- County
- Aroostook County, ME
- EIA plant ID
- 56448
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 42 MW | 2007 | – |
Nearby
Other plants in Aroostook County
Questions
Mars Hill Wind Farm Project, answered
How much power does Mars Hill Wind Farm Project produce?
Mars Hill Wind Farm Project has 42 MW of capacity from one generator. In 2025 it generated 128 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mars Hill Wind Farm Project power?
Its 2025 output of 128 GWh equals the yearly electricity use of about 20,000 average Maine homes (533 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mars Hill Wind Farm Project?
Mars Hill Wind Farm Project is in Aroostook County, Maine, at about 46.544°, -67.811°. It is one of 27 power plants of 1 MW or more in the county. The average electricity customer in Aroostook County goes 7.2 hours a year without power, the 16th most of 16 counties in Maine. The county's page has the full outage record.
Who operates Mars Hill Wind Farm Project?
It is operated by Evergreen Wind, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NBSO.
When did Mars Hill Wind Farm Project open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Maine home's 533 kWh a month in 2025. Methodology.