73 operating data center sites, 46 projects planned or under construction and 2 AI campuses planned to draw 336 MW. Pennsylvania ranks 12th of 51 by mapped sites.

Operating sites730 whole campuses
AI campuses2108 MW drawn now
In the pipeline462 under construction, 44 planned
Home price19.3¢/kWh+39% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Pennsylvania's AI data centers

CampusOwnerWhereNowPlanned
AWS BerwickAmazonLuzerne County108 MW212 MW
CoreWeave Lancaster Greenfield siteCoreWeaveLancaster County–124 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Panther Creek T5 Data Centers Schuylkill Under construction – –
PowerHouse Data Centers PAX-1 PowerHouse Data Centers Cumberland Under construction – –
Homer City Energy Campus Homer City Redevelopment Indiana Planned 4.5 GW 2027
TECfusions Keystone Connect TECfusions Westmoreland Planned 3.0 GW 2031
Shippingport Power Station and Data Center Frontier Group of Companies Beaver Planned 2.7 GW 2029
Gouldsboro Data Center 1778 Rich Pike LLC Lackawanna Planned 1.5 GW –
PAX – Pennsylvania Digital I PowerHouse Cumberland Planned 1.4 GW 2027
Keel Scrubgrass AI/HPC Data Center Campus Keel Infrastructure (formerly Bitfarms) Venango Planned 1.3 GW 2028
Lower Mount Bethel Tech Center Peron Development Northampton Planned 1.2 GW –
Microsoft Three Mile Island Energy Supply Constellation Energy Dauphin Planned 835 MW 2028
York 2 Energy Center Data Campus Energy Capital Partners York Planned 828 MW –
Breaker Street Data Center Catalyst Commercial Development Lackawanna Planned 600 MW 2027
Project Green Mountain Project Green Mountain developer not publicly disclosed Lackawanna Planned 525 MW –
Prime Data Centers — Starpointe Business Park campus Prime Data Centers Washington Planned 450 MW –
fifteenfortyseven Chester County Hyperscale Campus fifteenfortyseven Critical Systems Realty Chester Planned 450 MW 2024
Prologis Lehigh Valley East 16 Data Center Conversion Prologis Northampton Planned 300 MW –
Smithfield Gateway Data Center Smithfield Gateway developer not publicly disclosed Monroe Planned 250 MW –
Project Gravity Corscale Data Centers (land acquired Dec 2025 via US Gravity Purchaser LLC/Affinius Capital from Archbald 25 Developer LLC) Lackawanna Planned 186 MW –
Cheswick/Springdale AI Data Center Redevelopment Davidson Kempner Capital Management Allegheny Planned 180 MW –
Keel Sharon Data Center Expansion Keel Infrastructure (formerly Bitfarms) Mercer Planned 110 MW 2027

Local pushback

Bans and moratoriums

11 recorded as enacted, 2 proposed or under review, 6 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Buffalo Township · Butler Township Enacted Aug 12, 2026 to Feb 8, 2027
Pennsylvania · Dauphin State Proposed Jul 12, 2026 Term not documented
Butler Township · Luzerne Township Expired May 12, 2026 to Nov 8, 2026
Smithfield Township · Monroe Township Expired May 6, 2026 to Nov 2, 2026
West Whiteland Township · Chester Township Expired May 5, 2026 to Nov 1, 2026
East Whiteland Township · Chester Local Enacted Mar 1, 2026 A stated duration, but the end date isn't recorded here
Little Britain Township · Lancaster Township Enacted Jan 1, 2026 to Dec 6, 2026
Hazle Township · Luzerne Township Enacted Jan 1, 2026 to Dec 5, 2026
Gregg Township · Union Local Enacted Jan 1, 2026 to Feb 16, 2027
Allegheny County · Allegheny County Proposed Jan 1, 2026 Term not documented
Warrington Township · York Local Enacted Jan 1, 2026 Runs until a condition is met, not to a date
Lycoming County · Lycoming County Enacted Jan 1, 2026 to Dec 15, 2026
Muncy Township · Lycoming Local Enacted Jan 1, 2026 to Feb 1, 2027
Center Township · Butler Local Enacted Jan 1, 2026 to Dec 7, 2026
Brookville · Jefferson Borough Enacted Jan 1, 2026 to Dec 14, 2026

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Venango County3212 h
Allegheny County116.1 h
Philadelphia County71.8 h
Montgomery County513 h
Luzerne County42.5 h
Lehigh County33.0 h
Northampton County35.3 h
Butler County18.1 h
Clearfield County18.6 h
Pike County139 h

Every named site

The list

39 of 73 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Iron Mountain WPA-1 Iron Mountain Butler Civic Returns 7.6
Amazon AWS PHL Amazon Web Services Luzerne Building 6.2
Allentown-TekPark – Lehigh Building 3.3
Terminal Commerce Building – Philadelphia Building 2.7
Flexential Philadelphia - Collegeville Flexential Montgomery Building 2.5
TierPoint Valley Forge TierPoint Montgomery Building 1.4
DataBank Pittsburgh PIT2 – Allegheny Building 1.4
Flexential Allentown Data Center Flexential Lehigh Building 1.1
HPC data center Northern Data Allegheny Civic Returns 0.9
Lumen Norristown Lumen Montgomery Building 0.8
Expedient Pittsburgh South Expedient Allegheny Building 0.6
Tierpoint Lehigh Valley Data Center TierPoint Northampton Civic Returns 0.6
Tierpoint Philadelphia Data Center TierPoint Philadelphia Civic Returns 0.6
Tierpoint Bethlehem Data Center TierPoint Northampton Civic Returns 0.6
EdgeConneX PIT01 EdgeConneX Allegheny Civic Returns 0.3
DāStor: 3400 Horizon Drive – Montgomery Point –
Iron City No. 1 Power Generator and Compute Center – Clearfield Point –
Expedient Pittsburgh Nova Place Expedient Allegheny Point –
SES - Hawley Earth Station SES Pike Building –
11:11 Philadelphia Data Center 11:11 Systems Philadelphia Operator's own list –
Pittsburgh Supercomputing Center PSC machine room (Monroeville) Pittsburgh Supercomputing Center Allegheny Operator's own list –
Aligned Data Centers PIT-01 Aligned Data Centers Beaver Operator's own list –
Bitfarms (Keel) Panther Creek campus Bitfarms (Keel) Carbon Operator's own list –
Cogent Pittsburgh Data Center Cogent Communications Allegheny Operator's own list –
Colohouse (Hivelocity) Hivelocity Philadelphia 1 Colohouse (Hivelocity) Philadelphia Operator's own list –

How many data centers are in Pennsylvania?

73 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 12th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Pennsylvania?

2 under construction and 44 planned or announced in the Civic Returns and Server Country databases; the 20 that publish a size add up to about 20.5 GW, besides 2 AI campuses tracked by Epoch AI. 4 projects have been cancelled.

Which Pennsylvania county has the most data centers?

Venango County, with 32 operating sites, then Allegheny County (11) and Philadelphia County (7).

Who operates data centers in Pennsylvania?

Among sites that name an operator: TierPoint (7), Flexential (2), Expedient (2), 365 Data Centers (2), H5 Data Centers (2).

What AI data centers are in Pennsylvania?

AWS Berwick in Berwick (108 MW now, 212 MW planned); CoreWeave Lancaster Greenfield site in Lancaster (not yet drawing power, 124 MW planned), by Epoch AI's estimates.

What do Pennsylvania households pay for electricity?

19.3¢ per kWh on average in 2025 (US: 17.2¢), up 39% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.