AI data center · Lancaster, Pennsylvania

CoreWeave Lancaster Greenfield site

CoreWeave's AI campus in Lancaster County. It is not drawing power yet and is planned to reach 124 MW by June 2027.

Power now–As of Jul 13, 2026
Planned peak124 MWJune 2027
Compute–H100-equivalent chips now
Capital cost–So far, 2025 dollars

Latest look · Jul 13, 2026

What the satellite shows

Cooling install continues on the roof, satellite imagery indicates that not all units have been completed. Continued presence of construction vehicles and unfinished land on the campus suggests that the building is not operational yet.

Build-out

Power, month by month

0 MW50 MW100 MW150 MW20262027Today
Power drawn by CoreWeave Lancaster Greenfield site, from Epoch AI's dated observations and (hatched) its projections.
0 MW50 MW100 MW150 MW20262027Today
Power drawn by CoreWeave Lancaster Greenfield site, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
CoreWeave
Used by
OpenAI (speculative)
Investors
Blue Owl Capital
Chips
Rubin
Address
216 Greenfield Rd, Lancaster, PA
County
Lancaster County

Where

On the map of Pennsylvania

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Safe Harbor● Hydro418 MW11.1 mi
Dart Container Corp● Biomass11 MW5 mi
Ephrata PA BTM● Oil5 MW10.6 mi
Keystone Solar● Solar5 MW13.1 mi
TPE Pennsylvania Solar 1, LLC● Solar4 MW11.5 mi
Frey Farm Landfill● Biomass3 MW11.7 mi
PPL Frey Farm Landfill Wind● Wind3 MW12.2 mi
L&S Sweetners● Biomass3 MW6.5 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jul 13, 2026Cooling install continues on the roof, satellite imagery indicates that not all units have been completed. Continued presence of construction vehicles and unfinished land on the campus suggests that the building is not operational yet.–
Jul 15, 2025Coreweave announces $6 billion investment into Lancaster data centers, at two former printing press sites.–

Plus 1 projected step to June 2027, from Epoch AI's reading of the build plans.

How much power does CoreWeave Lancaster Greenfield site use?

It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 124 MW by June 2027.

Who owns CoreWeave Lancaster Greenfield site?

CoreWeave; used by OpenAI (speculative). Investors: Blue Owl Capital. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around CoreWeave Lancaster Greenfield site?

In Lancaster County, the average customer is without power about 2.8 hours in a typical year in this site's outage record, with 1 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near CoreWeave Lancaster Greenfield site?

8 plants within 15 miles total about 454 MW; the largest is Safe Harbor (418 MW, hydro), 11.1 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.