Data centers · New Mexico
Data centers in New Mexico
28 operating data center sites, 4 projects planned or under construction and 2 AI campuses planned to draw 2.7 GW.
The map
Every mapped site
AI campuses
New Mexico's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| Meta Los Lunas | Meta | Valencia County | 118 MW | 273 MW |
| OpenAI Stargate New Mexico | Oracle | Doña Ana County | – | 2.5 GW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| Project Jupiter | Stack Infrastructure | Doña Ana | Under construction | 1.0 GW | 2026 |
| New Era Energy Lea County AI Hub | New Era Energy & Digital | Lea | Planned | 7.0 GW | 2028 |
| Zenith Volts Roswell Data Center | Zenith Volts Corp. | Chaves | Planned | 1.3 GW | 2027 |
| Atterix Raton Advanced Digital Hub | Atterix LLC | Colfax | Planned | 50 MW | – |
| Socorro Green Data Campus | Green Data | Socorro | Cancelled | 2.0 GW | – |
Local pushback
Bans and moratoriums
4 recorded as enacted, 3 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Rio Communities · Valencia | City | Enacted | Aug 26, 2026 | to Aug 26, 2027 |
| Sierra County · Sierra | Local | Enacted | Jul 22, 2026 | to Jan 22, 2028 |
| Colfax County · Colfax | Local | Proposed | Jul 21, 2026 | Term not documented |
| New Mexico · Torrance | State | Proposed | Jul 2, 2026 | Term not documented |
| Santa Fe County · Santa Fe | Local | Enacted | Jul 2, 2026 | to Jan 2, 2028 |
| Raton · Colfax | City | Proposed | Jun 9, 2026 | Term not documented |
| Socorro County · Socorro | Local | Enacted | Jun 9, 2026 | to Jun 9, 2027 |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Bernalillo County | 13 | 1.8 h |
| Valencia County | 6 | 3.8 h |
| Doña Ana County | 3 | 2.4 h |
| Sandoval County | 2 | 3.6 h |
| Santa Fe County | 1 | 3.6 h |
| Los Alamos County | 1 | – |
| Torrance County | 1 | 11 h |
| Grant County | 1 | 4.8 h |
Every named site
The list
26 of 28 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| Meta | Meta | Valencia | Building | 15 |
| Meta | Meta | Valencia | Building | 15 |
| Meta | Meta | Valencia | Building | 15 |
| Meta | Meta | Valencia | Building | 15 |
| Meta | Meta | Valencia | Building | 12 |
| Information Systems Facility | WSMR | Doña Ana | Building | 0.8 |
| – | Lumen | Doña Ana | Building | 0.7 |
| John F. Simms Building | SONM | Santa Fe | Building | 0.7 |
| Molina Healthcare | – | Bernalillo | Building | 0.6 |
| Oso Grande | – | Bernalillo | Point | – |
| 505 Marquette | – | Bernalillo | Point | – |
| 123 Central | – | Bernalillo | Point | – |
| UNM Data Center | UNM | Bernalillo | Point | – |
| – | UNMH | Bernalillo | Point | – |
| HPC | – | Bernalillo | Building | – |
| Cogent Las Cruces Edge Data Center | Cogent Communications | Doña Ana | Operator's own list | – |
| Cogent Albuquerque Edge Data Center | Cogent Communications | Bernalillo | Operator's own list | – |
| Los Alamos National Laboratory Nicholas C. Metropolis Center for Modeling and Simulation (Strategic Computing Complex) | Los Alamos National Laboratory | Los Alamos | Operator's own list | – |
| Meta Los Lunas Data Center | Meta | Torrance | Operator's own list | – |
| Albuquerque 10 Mw Data Center (Westpointe Data Center) | – | Bernalillo | EPA record | – |
| Albuquerque Public Schools: Data Center | – | Bernalillo | EPA record | – |
| Nmrd Data Center Iii, Llc | – | Sandoval | EPA record | – |
| Nmrd Data Center Iii, Llc | – | Sandoval | EPA record | – |
| Solar Data Center White Horse Ranch | – | Grant | EPA record | – |
| Los Lunas Data Center | – | Valencia | Overture place | – |
| Albuquerque Data Center | – | Bernalillo | Overture place | – |
How many data centers are in New Mexico?
28 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 27th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in New Mexico?
1 under construction and 3 planned or announced in the Civic Returns and Server Country databases; the 4 that publish a size add up to about 9.3 GW, besides 2 AI campuses tracked by Epoch AI. 1 project has been cancelled.
Which New Mexico county has the most data centers?
Bernalillo County, with 13 operating sites, then Valencia County (6) and Doña Ana County (3).
Who operates data centers in New Mexico?
Among sites that name an operator: Meta (6), Cogent Communications (2), WSMR (1), Lumen (1), SONM (1).
What AI data centers are in New Mexico?
Meta Los Lunas in Los Lunas (118 MW now, 273 MW planned); OpenAI Stargate New Mexico in Santa Teresa (not yet drawing power, 2.5 GW planned), by Epoch AI's estimates.
What do New Mexico households pay for electricity?
14.8¢ per kWh on average in 2025 (US: 17.2¢), up 17% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.