Where the power comes from · 2025
New Mexico
Wind made 36% of the electricity generated in New Mexico in 2025, the 5th highest wind share of any state. In 2005, coal made 85% of it; in 2025, 21%.
The mix
New Mexico's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
New Mexico's power plants
176 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in New Mexico, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
New Mexico's power plants emitted 338 kg of CO₂ for each MWh they generated in 2024, against 947 kg in 2005: the 24th lowest of 51. 13 million metric tons in all.
New Mexico among the states
- Generation39.5 TWh37th
- Renewable share53%10th
- Carbon-free share53%15th
- Cleanest electricity (kg CO₂/MWh, 2024)33824th
- Wind share36%5th
- Natural gas share27%34th
- Coal share21%19th
- Solar share16%5th
More on New Mexico
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in New Mexico
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| SunZia Wind South | Wind | Lincoln | 2.6 GW | 108 GWh | – | 2026 |
| Four Corners | Coal | San Juan | 1.6 GW | 8.2 TWh | 57% | 1969 |
| SunZia Wind North | Wind | Torrance | 1.1 GW | 10 GWh | – | 2026 |
| Hobbs Generating Station | Natural gas | Lea | 682 MW | 3.3 TWh | 55% | 2008 |
| Luna Energy Facility | Natural gas | Luna | 650 MW | 1.7 TWh | 29% | 2006 |
| Sagamore Wind | Wind | Roosevelt | 522 MW | 2.1 TWh | 46% | 2020 |
| Arroyo Solar Energy Storage Hybrid | Solar | McKinley | 450 MW | 679 GWh | 17% | 2023 |
| Cunningham | Natural gas | Lea | 444 MW | 1.8 TWh | 46% | 1965 |
| Red Cloud Wind LLC | Wind | Lincoln | 350 MW | 1.2 TWh | 39% | 2021 |
| Rio Grande | Natural gas | Doña Ana | 348 MW | 790 GWh | 26% | 1958 |
| Clines Corners Wind Farm LLC | Wind | Torrance | 325 MW | 1.1 TWh | 37% | 2021 |
| La Joya NM | Wind | Torrance | 306 MW | 906 GWh | 34% | 2021 |
| San Juan Solar I | Solar | San Juan | 300 MW | 485 GWh | 18% | 2024 |
| Atrisco Energy Storage | Storage | Bernalillo | 300 MW | -34.7 GWh | – | 2024 |
| Atrisco Solar LLC | Solar | Bernalillo | 300 MW | 718 GWh | 27% | 2024 |
| El Cabo Wind | Wind | Torrance | 298 MW | 1.1 TWh | 41% | 2017 |
| Afton Generating Station | Natural gas | Doña Ana | 287 MW | 460 GWh | 18% | 2002 |
| Tecolote Wind LLC | Wind | Lincoln | 272 MW | 869 GWh | 37% | 2021 |
| Roosevelt County | Wind | Roosevelt | 250 MW | 984 GWh | 45% | 2015 |
| Oso Grande Wind Farm | Wind | Lea | 250 MW | 551 GWh | 25% | 2021 |
| Sky Ranch Solar | Solar | Valencia | 240 MW | 501 GWh | 24% | 2024 |
| Aragonne Wind LLC | Wind | Guadalupe | 235 MW | 615 GWh | 30% | 2006 |
| Milagro Solar I | Solar | Doña Ana | 225 MW | 279 GWh | – | 2025 |
| Grady Wind Energy Center, LLC | Wind | Curry | 221 MW | 805 GWh | 42% | 2019 |
| Maddox | Natural gas | Lea | 212 MW | 572 GWh | 31% | 1963 |
| New Mexico Wind Energy Center | Wind | Quay | 204 MW | 503 GWh | 28% | 2003 |
| Escalante (NM) | Solar | McKinley | 200 MW | 526 GWh | 30% | 2024 |
| Quail Ranch Solar and BESS | Storage | Bernalillo | 200 MW | 32 GWh | – | 2025 |
| TAG | Solar | Sandoval | 198 MW | 93 GWh | – | 2025 |
| Shallow Basket | Solar | Rio Arriba | 190 MW | 137 GWh | – | 2025 |
| Pyramid | Natural gas | Hidalgo | 186 MW | 267 GWh | 16% | 2003 |
| Broadview Energy JN, LLC | Wind | Curry | 182 MW | 669 GWh | 42% | 2017 |
| Buena Vista Energy Center | Solar | Otero | 170 MW | 388 GWh | 26% | 2023 |
| Valencia Energy Facility | Natural gas | Valencia | 160 MW | 147 GWh | 11% | 2008 |
| Reeves | Natural gas | Bernalillo | 154 MW | 167 GWh | 12% | 1960 |
| Rio Bravo | Natural gas | Bernalillo | 150 MW | 288 GWh | 22% | 2000 |
| Santa Teresa Solar | Solar | Doña Ana | 150 MW | – | – | 2026 |
| Broadview Energy KW, LLC | Wind | Curry | 143 MW | 531 GWh | 43% | 2017 |
| Carne Energy Storage, LLC | Storage | Luna | 130 MW | – | – | 2026 |
| Solar PV Development NM 18 II LLC | Solar | Luna | 130 MW | – | – | 2026 |
| San Juan Mesa Wind Project LLC | Wind | Roosevelt | 120 MW | 251 GWh | 24% | 2005 |
| Cunningham Solar I & BESS | Solar | Lea | 108 MW | – | – | 2026 |
| Duran Mesa LLC | Wind | Lincoln | 105 MW | 362 GWh | 39% | 2021 |
| Red Mesa Wind LLC | Wind | Sandoval | 102 MW | 163 GWh | 18% | 2010 |
| Caprock Wind Farm | Wind | Quay | 100 MW | 379 GWh | 43% | 2004 |
| High Lonesome Mesa LLC | Wind | Torrance | 100 MW | 313 GWh | 36% | 2009 |
| Borderlands Wind, LLC | Wind | Catron | 100 MW | 252 GWh | 29% | 2021 |
| Sky Ranch BESS II | Storage | Valencia | 100 MW | -3.0 GWh | – | 2025 |
| Lordsburg Generating | Natural gas | Hidalgo | 88 MW | 66 GWh | 9% | 2002 |
| Bluffview | Natural gas | San Juan | 86 MW | 412 GWh | – | 2005 |
| Chaves Solar, LLC | Solar | Chaves | 70 MW | 155 GWh | 25% | 2016 |
| Roswell Solar, LLC | Solar | Chaves | 70 MW | 153 GWh | 25% | 2016 |
| Jicarilla Solar 1 LLC | Solar | Rio Arriba | 70 MW | 107 GWh | 17% | 2023 |
| Sandia Energy Center | Storage | Bernalillo | 60 MW | – | – | 2026 |
| Macho Springs | Solar | Luna | 55 MW | 124 GWh | 26% | 2014 |
| Encino Solar Energy Center | Solar | Sandoval | 55 MW | 143 GWh | 30% | 2020 |
| Chino Mines | Natural gas | Grant | 54 MW | 205 GWh | 43% | 1959 |
| Casa Mesa Wind Energy Center Hybrid | Wind | Quay | 52 MW | 180 GWh | 40% | 2018 |
| Macho Springs Power I | Wind | Luna | 50 MW | 115 GWh | 26% | 2011 |
| Milo Wind Project LLC | Wind | Roosevelt | 50 MW | 184 GWh | 42% | 2016 |
| Britton Solar Energy Center | Solar | Torrance | 50 MW | 141 GWh | 32% | 2019 |
| Jicarilla Solar 2 | Solar | Rio Arriba | 50 MW | 128 GWh | 29% | 2023 |
| NMRD Data Center III, LLC | Solar | Sandoval | 50 MW | 136 GWh | 31% | 2023 |
| Route 66 Energy Center, LLC | Solar | Cibola | 50 MW | 132 GWh | 30% | 2022 |
| Route 66 Energy Storage | Storage | Cibola | 50 MW | 0.0 GWh | – | 2025 |
| LCEC Generation LLVC | Natural gas | Lea | 47 MW | 86 GWh | 21% | 2012 |
| Algodones | Natural gas | Sandoval | 45 MW | – | – | 1954 |
| La Luz Energy Center | Natural gas | Valencia | 42 MW | 15 GWh | 4% | 2015 |
| Cimarron Solar Facility | Solar | Colfax | 31 MW | 60 GWh | 23% | 2010 |
| Navajo Dam | Hydro | San Juan | 30 MW | 88 GWh | 34% | 1989 |
| Chaves County Solar II | Solar | Chaves | 30 MW | 71 GWh | 27% | 2023 |
| Sterling I Wind Farm | Wind | Lea | 30 MW | 111 GWh | 42% | 2017 |
| Alta Luna | Solar | Luna | 28 MW | 11 GWh | 5% | 2017 |
| Elephant Butte | Hydro | Sierra | 28 MW | 17 GWh | 7% | 1940 |
| Taos Mesa Energy Facility Hybrid | Solar | Taos | 28 MW | 36 GWh | 15% | 2022 |
| Wildcat Wind | Wind | Lea | 27 MW | 55 GWh | 23% | 2012 |
| Quay County | Oil | Quay | 27 MW | 0.0 GWh | – | 2013 |
| Caprock Solar 1 LLC | Solar | Quay | 25 MW | 57 GWh | 26% | 2016 |
| Kit Carson Co-Op | Storage | Taos | 24 MW | 0.0 GWh | – | 2025 |
| Roadrunner Solar | Solar | Doña Ana | 20 MW | 47 GWh | 27% | 2011 |
| Hayhurst New Mexico Solar | Solar | Eddy | 20 MW | 57 GWh | 32% | 2023 |
| Lightning Dock Geothermal | Geothermal | Hidalgo | 19 MW | 58 GWh | 35% | 2013 |
| Abiquiu Dam | Hydro | Rio Arriba | 16 MW | 16 GWh | 12% | 1989 |
| Ford Utilities Center | Natural gas | Bernalillo | 15 MW | 78 GWh | 60% | 2005 |
| SunE EPE2 LLC | Solar | Doña Ana | 12 MW | 26 GWh | 25% | 2012 |
| Angel Fire Energy Facility | Solar | Colfax | 11 MW | 15 GWh | 15% | 2023 |
| Santolina Solar Energy Center | Solar | Bernalillo | 11 MW | 27 GWh | 29% | 2015 |
| SPS4 Monument | Solar | Lea | 10 MW | 22 GWh | 25% | 2011 |
| SPS5 Hopi | Solar | Eddy | 10 MW | 21 GWh | 24% | 2011 |
| SPS1 Dollarhide | Solar | Lea | 10 MW | 23 GWh | 26% | 2011 |
| SPS2 Jal | Solar | Lea | 10 MW | 22 GWh | 25% | 2011 |
| SPS3 Lea | Solar | Lea | 10 MW | 23 GWh | 26% | 2011 |
| SunE EPE1 LLC | Solar | Doña Ana | 10 MW | 26 GWh | 30% | 2012 |
| Anderson Wind II | Wind | Chaves | 10 MW | 30 GWh | 34% | 2014 |
| South Valley Solar Energy Center | Solar | Bernalillo | 10 MW | 27 GWh | 30% | 2015 |
| Rio Communities Solar Energy Center | Solar | Valencia | 10 MW | 23 GWh | 27% | 2015 |
| Facebook 1 Solar Energy Center | Solar | Valencia | 10 MW | 23 GWh | 26% | 2017 |
| Facebook 2 Solar Energy Center | Solar | Bernalillo | 10 MW | 28 GWh | 32% | 2018 |
| Facebook 3 Solar Energy Center | Solar | Bernalillo | 10 MW | 28 GWh | 32% | 2018 |
| Vista Solar Energy Center | Solar | Valencia | 10 MW | 28 GWh | 32% | 2019 |
Coming next
Planned projects
The largest generators reported as planned in New Mexico, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| AC Ranch II | Solar | Lea | 230 MW | 2029 |
| Tip Top Solar Energy Center LLC | Solar | Lea | 220 MW | 2026 |
| Blackwater Solar Center - NM | Solar | Roosevelt | 200 MW | 2027 |
| Cunningham Solar II | Solar | Lea | 196 MW | 2027 |
| Gallegos Wind Farm, Phase 1 | Wind | Union | 190 MW | 2028 |
| Foxtail Flats Solar, LLC | Solar | San Juan | 170 MW | 2027 |
| Santa Teresa Solar | Storage | Doña Ana | 150 MW | 2026 |
| Corazon Energy Storage | Storage | Bernalillo | 150 MW | 2027 |
| Star Light Energy Center | Storage | Valencia | 100 MW | 2026 |
| Star Light Energy Center | Solar | Valencia | 100 MW | 2026 |
| Buena Vista Energy Center III | Storage | Otero | 100 MW | 2026 |
| Buena Vista Energy Center III | Solar | Otero | 100 MW | 2026 |
| Four Mile Mesa Solar, LLC | Solar | San Juan | 100 MW | 2027 |
| Four Mile Mesa Solar, LLC | Storage | San Juan | 100 MW | 2027 |
| Rockmont Solar and Storage Project | Solar | San Juan | 100 MW | 2027 |
| Oso Negro | Storage | Bernalillo | 100 MW | 2028 |
| Windy Lane Energy Center | Solar | De Baca | 90 MW | 2026 |
| Wildcat Solar Power Plant LLC | Solar | McKinley | 90 MW | 2028 |
| Foxtail Flats Solar, LLC | Storage | San Juan | 80 MW | 2027 |
| AC Ranch I | Solar | Lea | 75 MW | 2027 |
| Windy Lane Energy Center | Storage | De Baca | 68 MW | 2026 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
| NTEC Gas Plant | Natural gas | San Juan | 61 MW | 2028 |
Shut down
Retired since 2010
The largest generators retired in New Mexico since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| San Juan | Coal | 555 MW | 2022 |
| San Juan | Coal | 555 MW | 2017 |
| San Juan | Coal | 369 MW | 2022 |
| San Juan | Coal | 369 MW | 2017 |
| Escalante | Coal | 257 MW | 2020 |
| Four Corners | Coal | 253 MW | 2013 |
| Four Corners | Coal | 190 MW | 2013 |
| Four Corners | Coal | 190 MW | 2013 |
| Cunningham | Natural gas | 75 MW | 2024 |
| Rio Grande | Natural gas | 50 MW | 2025 |
| Milagro Cogeneration Plant | Natural gas | 30 MW | 2016 |
| Milagro Cogeneration Plant | Natural gas | 30 MW | 2016 |
| Milagro Cogeneration Plant | Natural gas | 30 MW | 2016 |
| Milagro Cogeneration Plant | Natural gas | 30 MW | 2016 |
| Las Vegas | Oil | 20 MW | 2011 |
| Animas | Natural gas | 19 MW | 2020 |
| Animas | Natural gas | 17 MW | 2012 |
| Carlsbad | Natural gas | 16 MW | 2017 |
| Animas | Natural gas | 9.0 MW | 2012 |
| Raton | Natural gas | 8.0 MW | 2012 |
| Raton | Coal | 7.5 MW | 2010 |
| Tucumcari | Oil | 4.8 MW | 2010 |
| Freeport McMoRan | Oil | 3.1 MW | 2025 |
| Freeport McMoRan | Oil | 3.1 MW | 2025 |
| Freeport McMoRan | Oil | 3.1 MW | 2025 |
| Freeport McMoRan | Oil | 3.1 MW | 2025 |
| Freeport McMoRan | Oil | 3.0 MW | 2025 |
| Freeport McMoRan | Oil | 3.0 MW | 2025 |
| Freeport McMoRan | Oil | 3.0 MW | 2025 |
| Freeport McMoRan | Oil | 3.0 MW | 2025 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.