Solar power plant · McKinley, NM
Escalante (NM)
Escalante (NM) is a 200 MW solar power plant in McKinley County, New Mexico, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2024. In 2025 it generated 526 GWh, about what 69,000 average New Mexico homes use in a year.
Escalante (NM) in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 6th largest, about 5.3% of the state's 3.8 GW of solar capacity.
McKinley County has 3 power plants of 1 MW or more with 658 MW in all; Escalante (NM) is 30% of that and the 2nd largest of 3 solar plants there.
Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in McKinley County goes 3.1 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Escalante (NM) (outlined) and other plants in McKinley County, shaded. 35.408, -108.081.
Plant facts
- Operator
- Origis Energy USA, Inc
- Sector
- IPP Non-CHP
- Grid operator
- PNM
- County
- McKinley County, NM
- EIA plant ID
- 66888
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OESCL | Solar Photovoltaic | 200 MW | 2024 | – |
Nearby
Other plants in McKinley County
Questions
Escalante (NM), answered
How much power does Escalante (NM) produce?
Escalante (NM) has 200 MW of capacity from one generator. In 2025 it generated 526 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Escalante (NM) power?
Its 2025 output of 526 GWh equals the yearly electricity use of about 69,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Escalante (NM)?
Escalante (NM) is in McKinley County, New Mexico, at about 35.408°, -108.081°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in McKinley County goes 3.1 hours a year without power. The county's page has the full outage record.
Who operates Escalante (NM)?
It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds balancing authority PNM.
When did Escalante (NM) open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.