Solar power plant · Eddy, NM
Hayhurst New Mexico Solar
Hayhurst New Mexico Solar is a 20 MW solar power plant in Eddy County, New Mexico, operated by Hayhurst New Mexico Solar. Its oldest generator still running came online in 2023. In 2025 it generated 57 GWh, about what 7,400 average New Mexico homes use in a year.
Hayhurst New Mexico Solar in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 28th largest, about 0.5% of the state's 3.8 GW of solar capacity.
Eddy County has 2 power plants of 1 MW or more with 30 MW in all; Hayhurst New Mexico Solar is 66% of that and the largest of 2 solar plants there.
Its capacity factor of 32% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Eddy County goes 3.1 hours a year without power, the 12th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hayhurst New Mexico Solar (outlined) and other plants in Eddy County, shaded. 32.071, -104.162.
Plant facts
- Operator
- Hayhurst New Mexico Solar
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Eddy County, NM
- EIA plant ID
- 66412
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HHNM | Solar Photovoltaic | 20 MW | 2023 | – |
Nearby
Other plants in Eddy County
Questions
Hayhurst New Mexico Solar, answered
How much power does Hayhurst New Mexico Solar produce?
Hayhurst New Mexico Solar has 20 MW of capacity from one generator. In 2025 it generated 57 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hayhurst New Mexico Solar power?
Its 2025 output of 57 GWh equals the yearly electricity use of about 7,400 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hayhurst New Mexico Solar?
Hayhurst New Mexico Solar is in Eddy County, New Mexico, at about 32.071°, -104.162°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Eddy County goes 3.1 hours a year without power, the 12th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Hayhurst New Mexico Solar?
It is operated by Hayhurst New Mexico Solar (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Hayhurst New Mexico Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.