Solar power plant · Eddy, NM
SPS5 Hopi
SPS5 Hopi is a 10 MW solar power plant in Eddy County, New Mexico, operated by SunE SPS5, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 21 GWh, about what 2,700 average New Mexico homes use in a year.
SPS5 Hopi in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 33rd largest, about 0.3% of the state's 3.8 GW of solar capacity.
Eddy County has 2 power plants of 1 MW or more with 30 MW in all; SPS5 Hopi is 34% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Eddy County goes 3.1 hours a year without power, the 12th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
SPS5 Hopi (outlined) and other plants in Eddy County, shaded. 32.346, -104.235.
Plant facts
- Operator
- SunE SPS5, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Eddy County, NM
- EIA plant ID
- 57740
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 10 MW | 2011 | – |
Nearby
Other plants in Eddy County
Questions
SPS5 Hopi, answered
How much power does SPS5 Hopi produce?
SPS5 Hopi has 10 MW of capacity from one generator. In 2025 it generated 21 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does SPS5 Hopi power?
Its 2025 output of 21 GWh equals the yearly electricity use of about 2,700 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is SPS5 Hopi?
SPS5 Hopi is in Eddy County, New Mexico, at about 32.346°, -104.235°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Eddy County goes 3.1 hours a year without power, the 12th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates SPS5 Hopi?
It is operated by SunE SPS5, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did SPS5 Hopi open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.