Wind power plant · Torrance, NM

El Cabo Wind

El Cabo Wind is a 298 MW wind power plant in Torrance County, New Mexico, operated by Avangrid Power LLC. Its oldest generator still running came online in 2017. In 2025 it generated 1.1 TWh, about what 138,000 average New Mexico homes use in a year.

Capacity298 MWNameplate, September 2026
Generated1.1 TWhIn 2025
Capacity factor41%Share of the most it could make, 2025
Generators1Oldest from 2017

El Cabo Wind in context

Among the 31 wind plants in New Mexico in the EIA's inventory, it is the 7th largest, about 3.7% of the state's 8.1 GW of wind capacity.

Torrance County has 7 power plants of 1 MW or more with 2.2 GW in all; El Cabo Wind is 14% of that and the 4th largest of 5 wind plants there.

Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Torrance County goes 11 hours a year without power, the 2nd most of 20 counties in New Mexico. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,50020182019202020212022202320242025GWh 1,058
05001,0001,50020192021202320251,058

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

El Cabo Wind (outlined) and other plants in Torrance County, shaded. 34.651, -105.462.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
PNM
County
Torrance County, NM
EIA plant ID
58098
Where New Mexico's power comes from → New Mexico power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 298 MW 2017 –

Questions

El Cabo Wind, answered

How much power does El Cabo Wind produce?

El Cabo Wind has 298 MW of capacity from one generator. In 2025 it generated 1.1 TWh, 41% of the most it could have made running flat out all year (its capacity factor).

How many homes does El Cabo Wind power?

Its 2025 output of 1.1 TWh equals the yearly electricity use of about 138,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is El Cabo Wind?

El Cabo Wind is in Torrance County, New Mexico, at about 34.651°, -105.462°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Torrance County goes 11 hours a year without power, the 2nd most of 20 counties in New Mexico. The county's page has the full outage record.

Who operates El Cabo Wind?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority PNM.

When did El Cabo Wind open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.