Storage power plant · Luna, NM
Carne Energy Storage, LLC
Carne Energy Storage, LLC is a 130 MW storage power plant in Luna County, New Mexico, operated by Carne Energy Storage, LLC. Its oldest generator still running came online in 2026.
Carne Energy Storage, LLC in context
Among the 8 storage plants in New Mexico in the EIA's inventory, it is the 3rd largest, about 15% of the state's 865 MW of storage capacity.
Luna County has 9 power plants of 1 MW or more with 1.1 GW in all; Carne Energy Storage, LLC is 12% of that.
The average electricity customer in Luna County goes 1.4 hours a year without power, the 19th most of 20 counties in New Mexico. The county's page has the full outage record.
Where it is
Carne Energy Storage, LLC (outlined) and other plants in Luna County, shaded. 32.315, -107.678.
Plant facts
- Operator
- Carne Energy Storage, LLC
- Sector
- IPP Non-CHP
- Grid operator
- EPE
- County
- Luna County, NM
- EIA plant ID
- 67230
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CS | Batteries | 130 MW · 260 MWh | 2026 | – |
Nearby
Other plants in Luna County
Questions
Carne Energy Storage, LLC, answered
How much can Carne Energy Storage, LLC store and deliver?
Carne Energy Storage, LLC can deliver up to 130 MW and hold 260 MWh of energy, from one battery or storage system.
Where is Carne Energy Storage, LLC?
Carne Energy Storage, LLC is in Luna County, New Mexico, at about 32.315°, -107.678°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Luna County goes 1.4 hours a year without power, the 19th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Carne Energy Storage, LLC?
It is operated by Carne Energy Storage, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority EPE.
When did Carne Energy Storage, LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.