Solar power plant · Bernalillo, NM
Atrisco Solar LLC
Atrisco Solar LLC is a 300 MW solar power plant in Bernalillo County, New Mexico, operated by Atrisco Solar LLC. Its oldest generator still running came online in 2024. In 2025 it generated 718 GWh, about what 94,000 average New Mexico homes use in a year.
Atrisco Solar LLC in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 3rd largest, about 7.9% of the state's 3.8 GW of solar capacity.
Bernalillo County has 19 power plants of 1 MW or more with 1.2 GW in all; Atrisco Solar LLC is 24% of that and the largest of 11 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Bernalillo County goes 1.8 hours a year without power, the 16th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Atrisco Solar LLC (outlined) and other plants in Bernalillo County, shaded. 35.189, -106.861.
Plant facts
- Operator
- Atrisco Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- PNM
- County
- Bernalillo County, NM
- EIA plant ID
- 67003
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ATRPV | Solar Photovoltaic | 300 MW | 2024 | – |
Questions
Atrisco Solar LLC, answered
How much power does Atrisco Solar LLC produce?
Atrisco Solar LLC has 300 MW of capacity from one generator. In 2025 it generated 718 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Atrisco Solar LLC power?
Its 2025 output of 718 GWh equals the yearly electricity use of about 94,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Atrisco Solar LLC?
Atrisco Solar LLC is in Bernalillo County, New Mexico, at about 35.189°, -106.861°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Bernalillo County goes 1.8 hours a year without power, the 16th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Atrisco Solar LLC?
It is operated by Atrisco Solar LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority PNM.
When did Atrisco Solar LLC open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.