Storage power plant · Bernalillo, NM
Sandia Energy Center
Sandia Energy Center is a 60 MW storage power plant in Bernalillo County, New Mexico, operated by PNM Resources. Its oldest generator still running came online in 2026.
Sandia Energy Center in context
Among the 8 storage plants in New Mexico in the EIA's inventory, it is the 5th largest, about 6.9% of the state's 865 MW of storage capacity.
Bernalillo County has 19 power plants of 1 MW or more with 1.2 GW in all; Sandia Energy Center is 5% of that and the 3rd largest of 4 storage plants there.
The average electricity customer in Bernalillo County goes 1.8 hours a year without power, the 16th most of 20 counties in New Mexico. The county's page has the full outage record.
Where it is
Sandia Energy Center (outlined) and other plants in Bernalillo County, shaded. 35.057, -106.528.
Plant facts
- Operator
- PNM Resources
- Sector
- Electric Utility
- Grid operator
- PNM
- County
- Bernalillo County, NM
- EIA plant ID
- 68210
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BESS | Batteries | 60 MW · 240 MWh | 2026 | – |
Questions
Sandia Energy Center, answered
How much can Sandia Energy Center store and deliver?
Sandia Energy Center can deliver up to 60 MW and hold 240 MWh of energy, from one battery or storage system.
Where is Sandia Energy Center?
Sandia Energy Center is in Bernalillo County, New Mexico, at about 35.057°, -106.528°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Bernalillo County goes 1.8 hours a year without power, the 16th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Sandia Energy Center?
It is operated by PNM Resources (EIA sector: Electric Utility), and it feeds balancing authority PNM.
When did Sandia Energy Center open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.