Solar power plant · Lea, NM
SPS2 Jal
SPS2 Jal is a 10 MW solar power plant in Lea County, New Mexico, operated by SunE SPS2, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 22 GWh, about what 2,800 average New Mexico homes use in a year.
SPS2 Jal in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 35th largest, about 0.3% of the state's 3.8 GW of solar capacity.
Lea County has 13 power plants of 1 MW or more with 1.8 GW in all; SPS2 Jal is 1% of that and the 4th largest of 6 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
SPS2 Jal (outlined) and other plants in Lea County, shaded. 32.184, -103.183.
Plant facts
- Operator
- SunE SPS2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Lea County, NM
- EIA plant ID
- 57737
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 10 MW | 2011 | – |
Questions
SPS2 Jal, answered
How much power does SPS2 Jal produce?
SPS2 Jal has 10 MW of capacity from one generator. In 2025 it generated 22 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does SPS2 Jal power?
Its 2025 output of 22 GWh equals the yearly electricity use of about 2,800 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is SPS2 Jal?
SPS2 Jal is in Lea County, New Mexico, at about 32.184°, -103.183°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates SPS2 Jal?
It is operated by SunE SPS2, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did SPS2 Jal open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.