Wind power plant · Lea, NM
Oso Grande Wind Farm
Oso Grande Wind Farm is a 250 MW wind power plant in Lea County, New Mexico, operated by Tucson Electric Power Co. Its oldest generator still running came online in 2021. In 2025 it generated 551 GWh, about what 72,000 average New Mexico homes use in a year.
Oso Grande Wind Farm in context
Among the 31 wind plants in New Mexico in the EIA's inventory, it is the 10th largest, about 3.1% of the state's 8.1 GW of wind capacity.
Lea County has 13 power plants of 1 MW or more with 1.8 GW in all; Oso Grande Wind Farm is 14% of that and the largest of 3 wind plants there.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oso Grande Wind Farm (outlined) and other plants in Lea County, shaded. 32.932, -103.666.
Plant facts
- Operator
- Tucson Electric Power Co
- Sector
- Electric Utility
- Grid operator
- TEPC
- County
- Lea County, NM
- EIA plant ID
- 63502
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OGW45 | Onshore Wind Turbine | 216 MW | 2021 | – |
| OGW24 | Onshore Wind Turbine | 34 MW | 2021 | – |
Questions
Oso Grande Wind Farm, answered
How much power does Oso Grande Wind Farm produce?
Oso Grande Wind Farm has 250 MW of capacity from 2 generators. In 2025 it generated 551 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oso Grande Wind Farm power?
Its 2025 output of 551 GWh equals the yearly electricity use of about 72,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oso Grande Wind Farm?
Oso Grande Wind Farm is in Lea County, New Mexico, at about 32.932°, -103.666°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Oso Grande Wind Farm?
It is operated by Tucson Electric Power Co (EIA sector: Electric Utility), and it feeds balancing authority TEPC.
When did Oso Grande Wind Farm open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.