Wind power plant · Lea, NM
Sterling I Wind Farm
Sterling I Wind Farm is a 30 MW wind power plant in Lea County, New Mexico, operated by AEM Wind LLC. Its oldest generator still running came online in 2017. In 2025 it generated 111 GWh, about what 15,000 average New Mexico homes use in a year.
Sterling I Wind Farm in context
Among the 31 wind plants in New Mexico in the EIA's inventory, it is the 25th largest, about 0.4% of the state's 8.1 GW of wind capacity.
Lea County has 13 power plants of 1 MW or more with 1.8 GW in all; Sterling I Wind Farm is 2% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sterling I Wind Farm (outlined) and other plants in Lea County, shaded. 33.360, -103.251.
Plant facts
- Operator
- AEM Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Lea County, NM
- EIA plant ID
- 60991
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| STER1 | Onshore Wind Turbine | 30 MW | 2017 | – |
Questions
Sterling I Wind Farm, answered
How much power does Sterling I Wind Farm produce?
Sterling I Wind Farm has 30 MW of capacity from one generator. In 2025 it generated 111 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sterling I Wind Farm power?
Its 2025 output of 111 GWh equals the yearly electricity use of about 15,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sterling I Wind Farm?
Sterling I Wind Farm is in Lea County, New Mexico, at about 33.360°, -103.251°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Sterling I Wind Farm?
It is operated by AEM Wind LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Sterling I Wind Farm open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.