Solar power plant · Lea, NM
SPS1 Dollarhide
SPS1 Dollarhide is a 10 MW solar power plant in Lea County, New Mexico, operated by SunE SPS1, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 23 GWh, about what 2,900 average New Mexico homes use in a year.
SPS1 Dollarhide in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 34th largest, about 0.3% of the state's 3.8 GW of solar capacity.
Lea County has 13 power plants of 1 MW or more with 1.8 GW in all; SPS1 Dollarhide is 1% of that and the 3rd largest of 6 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
SPS1 Dollarhide (outlined) and other plants in Lea County, shaded. 32.127, -103.138.
Plant facts
- Operator
- SunE SPS1, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Lea County, NM
- EIA plant ID
- 57736
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 10 MW | 2011 | – |
Questions
SPS1 Dollarhide, answered
How much power does SPS1 Dollarhide produce?
SPS1 Dollarhide has 10 MW of capacity from one generator. In 2025 it generated 23 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does SPS1 Dollarhide power?
Its 2025 output of 23 GWh equals the yearly electricity use of about 2,900 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is SPS1 Dollarhide?
SPS1 Dollarhide is in Lea County, New Mexico, at about 32.127°, -103.138°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Lea County goes 2.6 hours a year without power, the 14th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates SPS1 Dollarhide?
It is operated by SunE SPS1, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did SPS1 Dollarhide open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.