Solar power plant · Otero, NM
Buena Vista Energy Center
Buena Vista Energy Center is a 170 MW solar power plant in Otero County, New Mexico, operated by Buena Vista Energy Center, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 388 GWh, about what 51,000 average New Mexico homes use in a year.
Buena Vista Energy Center in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 9th largest, about 4.5% of the state's 3.8 GW of solar capacity.
Otero County has 5 power plants of 1 MW or more with 193 MW in all; Buena Vista Energy Center is 88% of that and the largest of 5 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Otero County goes 4.3 hours a year without power, the 6th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Buena Vista Energy Center (outlined) and other plants in Otero County, shaded. 32.067, -106.285.
Plant facts
- Operator
- Buena Vista Energy Center, LLC
- Sector
- IPP Non-CHP
- Grid operator
- EPE
- County
- Otero County, NM
- EIA plant ID
- 66408
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BVEC1 | Solar Photovoltaic | 120 MW | 2023 | – |
| BESS1 | Batteries | 50 MW · 200 MWh | 2023 | – |
Nearby
Other plants in Otero County
Questions
Buena Vista Energy Center, answered
How much power does Buena Vista Energy Center produce?
Buena Vista Energy Center has 170 MW of capacity from 2 generators. In 2025 it generated 388 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Buena Vista Energy Center power?
Its 2025 output of 388 GWh equals the yearly electricity use of about 51,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Buena Vista Energy Center?
Buena Vista Energy Center is in Otero County, New Mexico, at about 32.067°, -106.285°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Otero County goes 4.3 hours a year without power, the 6th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Buena Vista Energy Center?
It is operated by Buena Vista Energy Center, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority EPE.
When did Buena Vista Energy Center open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.