Solar power plant · Quay, NM
Caprock Solar 1 LLC
Caprock Solar 1 LLC is a 25 MW solar power plant in Quay County, New Mexico, operated by Deriva Energy. Its oldest generator still running came online in 2016. In 2025 it generated 57 GWh, about what 7,400 average New Mexico homes use in a year.
Caprock Solar 1 LLC in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 26th largest, about 0.7% of the state's 3.8 GW of solar capacity.
Quay County has 6 power plants of 1 MW or more with 409 MW in all; Caprock Solar 1 LLC is 6% of that.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Quay County goes 3.4 hours a year without power, the 11th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Caprock Solar 1 LLC (outlined) and other plants in Quay County, shaded. 34.983, -103.378.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Quay County, NM
- EIA plant ID
- 59251
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 25 MW | 2016 | – |
Nearby
Other plants in Quay County
Questions
Caprock Solar 1 LLC, answered
How much power does Caprock Solar 1 LLC produce?
Caprock Solar 1 LLC has 25 MW of capacity from one generator. In 2025 it generated 57 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Caprock Solar 1 LLC power?
Its 2025 output of 57 GWh equals the yearly electricity use of about 7,400 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Caprock Solar 1 LLC?
Caprock Solar 1 LLC is in Quay County, New Mexico, at about 34.983°, -103.378°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Quay County goes 3.4 hours a year without power, the 11th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Caprock Solar 1 LLC?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Caprock Solar 1 LLC open?
Its oldest generator still running came online in 2016.