Solar power plant · Rio Arriba, NM

Jicarilla Solar 2

Jicarilla Solar 2 is a 50 MW solar power plant in Rio Arriba County, New Mexico, operated by Repsol Renewables NA. Its oldest generator still running came online in 2023. In 2025 it generated 128 GWh, about what 17,000 average New Mexico homes use in a year.

Capacity50 MWNameplate, September 2026
Generated128 GWhIn 2025
Capacity factor29%Share of the most it could make, 2025
Generators1Oldest from 2023

Jicarilla Solar 2 in context

Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 19th largest, about 1.3% of the state's 3.8 GW of solar capacity.

Rio Arriba County has 7 power plants of 1 MW or more with 338 MW in all; Jicarilla Solar 2 is 15% of that and the 3rd largest of 5 solar plants there.

Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Rio Arriba County goes 10 hours a year without power, the 3rd most of 20 counties in New Mexico. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0501001502022202320242025GWh 128
0501001502022202320242025128

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Jicarilla Solar 2 (outlined) and other plants in Rio Arriba County, shaded. 36.141, -107.171.

Plant facts

Operator
Repsol Renewables NA
Sector
IPP Non-CHP
Grid operator
PNM
County
Rio Arriba County, NM
EIA plant ID
65103
Where New Mexico's power comes from → New Mexico power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
JICS2 Solar Photovoltaic 50 MW 2023 –

Nearby

Other plants in Rio Arriba County

Shallow Basket · 190 MWJicarilla Solar 1 LLC · 70 MWAbiquiu Dam · 16 MWEl Vado Dam · 8.0 MWAlcalde Solar Array · 2.4 MWSyncarpha El Rito · 1.6 MW

Questions

Jicarilla Solar 2, answered

How much power does Jicarilla Solar 2 produce?

Jicarilla Solar 2 has 50 MW of capacity from one generator. In 2025 it generated 128 GWh, 29% of the most it could have made running flat out all year (its capacity factor).

How many homes does Jicarilla Solar 2 power?

Its 2025 output of 128 GWh equals the yearly electricity use of about 17,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Jicarilla Solar 2?

Jicarilla Solar 2 is in Rio Arriba County, New Mexico, at about 36.141°, -107.171°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Rio Arriba County goes 10 hours a year without power, the 3rd most of 20 counties in New Mexico. The county's page has the full outage record.

Who operates Jicarilla Solar 2?

It is operated by Repsol Renewables NA (EIA sector: IPP Non-CHP), and it feeds balancing authority PNM.

When did Jicarilla Solar 2 open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.